Bunn DUAL SH DBC Скачать руководство пользователя страница 2

Harness to the piggy back terminal.

6.  Loosen the clamp on the power cable connector and push 

the 2 violet wires thru connector so they extend out the 

bottom of the brewer, tighten the clamp. 

7.  Route the long white wire of the Relay/Bracket Assembly 

up to the Main Control Board located in the hood.  

8.  Refer to Fig 3, disconnect the Main Harness from J11 

connector of the Main Control Board. Refer to Fig 4, locate 

the open port (J11-1) of the Main Harness Connector and 

insert the terminal of the long white wire from the Relay/

Bracket Assembly.

 

Note: The Terminal must lock into the Connector. When 

inserting terminal into connector, the slpit side of the ter-

minal must be facing the locking side of the connector as 

shown, for the terminal to lock in place.

9.  If a new Main Control Board is included in the Kit, proceed 

to step 11. If the Kit does not include a new Main Control 

Board, reconnect Main Harness to Main Control Board and 

continue to step 10.

10. Connect USB Flash Programmer #40413.1009 to connec-

tor J1 on the Main Control Board to flash new software 

into the Control Board, then proceed to step 16.

11. Refer to Fig 5, disconnect the funnel sensor(s) from con-

nector J9, the ribbon cable from connector J4, and the level 

probe harness and server detect harness from connector J2 

on the circuit board.

12. Remove the two mounting nuts securing the top of the circuit 

board to the hood.

13. Tilt the circuit board inward to clear the display section and 

lift out of the circuit board mount.

14. Place the bottom edge of new control board in the control 

board mount (as shown), tilt the board forward, and secure  

top of control board with the two mounting nuts.

15. Refer to Fig 5, connect all wires to the circuit board.

16. Install all Panels and Covers on the Brewer. Audible Alarm 

may now be connected to the 2 violet wires extending out 

the bottom of the Brewer.

Left Funnel Sensor 

(Violet/White Violet)

Right Funnel Sensor 

(Yellow/White Yellow)

Connector locking side

Split side of Terminal

J11-1

FIG 3

FIG 4

FIG 2

43148 050410

FIG 5

Violet wires from termi-

nals 5 & 7 of the relay to 

be routed out the bottom 

of brewer thru the power 

cable connector

WHITE wires from termi-

nals A & B of the relay to 

refill valve and J11-1 on 

main circuit board

Отзывы: