Bunn AXIOM DV-APS Скачать руководство пользователя страница 2

BUNN

®

 practices continuous product research and improvement. We reserve the right to change specifications and product design without notice. Such 

revisions do not entitle the buyer to corresponding changes, improvements, additions or replacements for previously purchased equipment.

All dimensions shown in inches.                                 

Dimensions & Specifications

Bunn-O-Matic

®

 Corporation - 1400 Stevenson Drive Springfield, Illinois 62703 • 800-637-8606 • 217-529-6601 • Fax 217-529-6644 • www.bunn.com

13.1 GOURMET

SST NARROW

Model 

Product # 

Volts 

Amps  Tank Heater  Total 

Brewing 

Cu.  

Shipping 

Cord 

 

 

 

 

Watts  Watts Capacity  Ft. 

Weight  Attached

AXIOM-DV-APS  38700.0010 

120 

12.5 

1425 

1500 

4.2 gal./hr. 

5.2 

36 lbs. 

Yes 

(

plastic funnel)

 

 

120/208 

13 

2620 

2680 

7.5 gal./hr. 

 

 

 

 

120/240 

15 

3500 

3550 

7.5 gal./hr. 

 

AXIOM-DV-APS  38700.0034 

120 

12.5 

1425 

1500 

4.2 gal./hr. 

5.2 

36 lbs. 

Yes 

(

gourmet funnel)  

 

120/208 

13 

2620 

2680 

7.5 gal./hr. 

 

 

 

 

120/240 

15 

3500 

3550 

7.5 gal./hr. 

 

Brewing capacity: based upon incoming water temp of 60ºF (140ºF rise) per 1/2 gallon brew time of 4 minutes.

Electrical:  If wired for 120V, requires 2-wires plus ground service rated 120V, single phase, 60 Hz. 
 

If wired for 120/208V or 120/240V, requires 3-wires plus ground service rated 120/208V or 120/240V, 

 

single phase, 60 Hz.

Plumbing:  20-90 psi (138-621 kPa). Supplied with

 1

4

" male flare fitting.  Tank capacity: 200 ounces (5.9 L)

3/09 © Bunn-O-Matic Corporation

Содержание AXIOM DV-APS

Страница 1: ...e extraction controlled with programmable pre infusion pulse brew and digital temperature control Hot water faucet SplashGard funnel deflects hot liquids away from the hand Energy saver mode reduces t...

Страница 2: ...apacity Ft Weight Attached AXIOM DV APS 38700 0010 120 12 5 1425 1500 4 2 gal hr 5 2 36 lbs Yes plastic funnel 120 208 13 2620 2680 7 5 gal hr 120 240 15 3500 3550 7 5 gal hr AXIOM DV APS 38700 0034 1...

Страница 3: ...ision of the Operating Manual or to view the Illustrated Parts Catalog Programming Manual or Service Manual please visit the Bunn O Matic website at www bunn com This is absolutely FREE and the quicke...

Страница 4: ...s that are binding on BUNN Accordingly statements by such individuals whether oral or written do not constitute warranties and should not be relied upon If BUNN determines in its sole discretion that...

Страница 5: ...ional Field Wiring 120 208 240 V 15 6 17 5 A 2980 3850 W 1PH 3 Wire GND 60HZ 29710 0007 3 Warmers 37881 0002 INTRODUCTION This equipment will brew a 1 2 gallon batch of coffee into an awaiting server...

Страница 6: ...10 Set voltage switch to the appropriate position and replace the access panel DV Models Only 11 If plumbing is to be hooked up later be sure the brewer is disconnected from the power source If plumb...

Страница 7: ...AL BRANCH CIRCUIT RATED 20 AMPS Dual Voltage Switch in 120V position Dual Voltage Switch in 120 208 240V position 120 208 120 240V AC Single phase models Note This electrical service requires 3 curren...

Страница 8: ...er to clean the counter top Bunn O Matic does not recommend the use of a saddle valve to install the brewer The size and shape of the hole made in the supply line by this type of device may restrict w...

Страница 9: ...ide of the brewer turns power on and off to all components in the brewer P3633 39130 092110 COFFEE BREWING 1 Begin each brew cycle with a clean empty brew funnel 2 Insert a BUNN filter into the funnel...

Страница 10: ...g problems in the brewer and takes less than a minute NOTE In the event that the Brew Logic circuit activates compensating for high lime build up it will temporarily disable the Recovery Booster and P...

Страница 11: ...r can customize the brewing process to their specifications PROGRAMMING SWITCHES 1 FUNCTION SCREEN This is the display which shows the various functions 2 Right of the display This is used to access t...

Страница 12: ...ADY 195 DONE SET TEMP 200 DONE ENTER PASSWORD 0 0 0 EXITING BrewWIZARD BREW LOCKOUT NO DONE YES PROGRAMMING FUNCTIONS FLOW CHART CONT BrewWIZARD ENTER SERVICE NO YES UNITS METRIC DONE ENG SET LANGUAGE...

Страница 13: ...ABL WARMER OFF NO DONE YES EnableFreshTimer NO DONE YES ENABLE CLEAN NO DONE YES SET PULSE BREW NO YES ADJUSTMENTS OPTIONAL SETTINGS CONT LEVEL 2 CONT AXIOM VERSION xx xx Return To Main Screen Display...

Страница 14: ...he sprayhead openings must always remain open 3 Remove the sprayhead 2 Use a clean damp cloth rinsed in mild non abrasive detergent to clean the sprayhead panel 1 Clean and sanitize the funnel NOTE Do...

Отзывы: