Bunn AXIOM-DV-3 Скачать руководство пользователя страница 6

Page 4

ELECTRICAL REQUIREMENTS

39130 120809

WARNING - 

The brewer must be disconnected from the power source until specified in Initial Set-Up.

Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements.

ELECTRICAL HOOK-UP (All Models)

CAUTION – 

Improper electrical installation will damage electronic components. 

1.  An electrician must provide electrical service.

2.  Determine the available on-site electrical service.

3.  Select the desired unit voltage based on the available on-site electrical service.

4.  Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.

5.  Remove the front access panel beneath the sprayhead to gain access to the terminal block.

6.  Feed the supply leads through the rear of the brewer.

7.  Using the above diagrams, connect the desired electrical service to the field wiring terminal block.

8.  If wiring the machine for operation on 120/208 or 120/240 volts with a Power Supply Cord, the Power 

Supply Cord must be UL Listed Flexible Cord Type SO, SJO, SJTO, HSJO or SJOW, No. 12 AWG, 4 Con-

ductor, Rated 90° C. Attachment Plug Cap must be UL Listed, NEMA 14-20P or L14-20P Configuration, 

Rated 125/250V, 20 AMPS. The Power Supply Cord must be at least 3 feet long and maximum 6 feet long 

(measured from Strain Relief to end of the Attachment Plug Cap).

9.  Before proceeding, verify the voltage at the field wiring terminal block.

10.  Set voltage switch to the appropriate position and replace the access panel. (DV Models Only)

11.  If plumbing is to be hooked up later be sure the brewer is disconnected from the power source.  If 

plumbing has been hooked up, the brewer is ready for Initial Set-Up.

Note: 

This electrical service requires 

3 current carrying conductors (Neutral, 

L1 and L2) and a separate conductor for 

earth ground.

Note: 

Power cord must be 

connected to center terminal 

block on all Twins unless 

otherwise noted.

Twins

CE REQUIREMENTS

• This appliance must be installed in locations where it can be overseen by trained personnel.

• For proper operation, this appliance must be installed where the temperature is between 5°C to 35°C.

• Appliance shall not be tilted more than 10° for safe operation.

• An electrician must provide electrical service as specified in conformance with all local and national codes.

• This appliance must not be cleaned by water jet.

• This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental 

capabilities, or lack of experience and knowledge, unless they have been given instructions concerning use of 

this appliance by a person responsible for its safety.

• Children should be supervised to ensure they do not play with the appliance.

• If the power cord is ever damaged, it must be replaced by the manufacturer or authorized service personnel with 

a special cord available from the manufacturer or its authorized service personnel in order to avoid a hazard.

• Machine must not be immersed for cleaning.

All Twins are 120/208 & 120/240V AC 

Single phase unless otherwise noted.

Содержание AXIOM-DV-3

Страница 1: ...flects hot liquids away from the hand Coffee extraction controlled with programmable pre infusion pulse brew and digital temperature control Energy saver mode reduces tank temperature during idle peri...

Страница 2: ...ank Heater Total Brewing Cu Shipping Cord Watts Watts Capacity Ft Weight Attached AXIOM DV 3 38700 0080 120 15 1425 1800 4 2 gal hr 4 0 30 lbs Yes BrewWISE 120 208 15 5 2620 2980 7 5 gal hr 1L 2U Warm...

Страница 3: ...ision of the Operating Manual or to view the Illustrated Parts Catalog Programming Manual or Service Manual please visit the Bunn O Matic website at www bunn com This is absolutely FREE and the quicke...

Страница 4: ...s that are binding on BUNN Accordingly statements by such individuals whether oral or written do not constitute warranties and should not be relied upon If BUNN determines in its sole discretion that...

Страница 5: ...ional Field Wiring 120 208 240 V 15 6 17 5 A 2980 3850 W 1PH 3 Wire GND 60HZ 29710 0007 3 Warmers 37881 0002 INTRODUCTION This equipment will brew a 1 2 gallon batch of coffee into an awaiting server...

Страница 6: ...10 Set voltage switch to the appropriate position and replace the access panel DV Models Only 11 If plumbing is to be hooked up later be sure the brewer is disconnected from the power source If plumb...

Страница 7: ...AL BRANCH CIRCUIT RATED 20 AMPS Dual Voltage Switch in 120V position Dual Voltage Switch in 120 208 240V position 120 208 120 240V AC Single phase models Note This electrical service requires 3 curren...

Страница 8: ...er to clean the counter top Bunn O Matic does not recommend the use of a saddle valve to install the brewer The size and shape of the hole made in the supply line by this type of device may restrict w...

Страница 9: ...ide of the brewer turns power on and off to all components in the brewer P3633 39130 092110 COFFEE BREWING 1 Begin each brew cycle with a clean empty brew funnel 2 Insert a BUNN filter into the funnel...

Страница 10: ...g problems in the brewer and takes less than a minute NOTE In the event that the Brew Logic circuit activates compensating for high lime build up it will temporarily disable the Recovery Booster and P...

Страница 11: ...r can customize the brewing process to their specifications PROGRAMMING SWITCHES 1 FUNCTION SCREEN This is the display which shows the various functions 2 Right of the display This is used to access t...

Страница 12: ...ADY 195 DONE SET TEMP 200 DONE ENTER PASSWORD 0 0 0 EXITING BrewWIZARD BREW LOCKOUT NO DONE YES PROGRAMMING FUNCTIONS FLOW CHART CONT BrewWIZARD ENTER SERVICE NO YES UNITS METRIC DONE ENG SET LANGUAGE...

Страница 13: ...ABL WARMER OFF NO DONE YES EnableFreshTimer NO DONE YES ENABLE CLEAN NO DONE YES SET PULSE BREW NO YES ADJUSTMENTS OPTIONAL SETTINGS CONT LEVEL 2 CONT AXIOM VERSION xx xx Return To Main Screen Display...

Страница 14: ...he sprayhead openings must always remain open 3 Remove the sprayhead 2 Use a clean damp cloth rinsed in mild non abrasive detergent to clean the sprayhead panel 1 Clean and sanitize the funnel NOTE Do...

Отзывы: