
Revision 0.36 [01/27/2015]
Page 9
5.
Run the electrical (120vAC) to the blowers from the CERV-001-PARTB high voltage
junction box. Each blower is controlled individually, so each blower will have a labeled
separate hot (red) and neutral (white) wire in the HV junction box. The supply blower
wires will be labeled BinN and BinH, while the exhaust blower wires will be labeled
BoutN and BoutH. Blowers may share the same ground (green).
6.
Run the low voltage wire from PARTA to PARTB (LV control terminals F+ (red) and F-
(black)). Low voltage wiring does not need to be inside conduit, just ensure that it is secure.
See figure below. Use the included Quick Connect terminals for Part A.