SCS 104
7.7 Replacing the filter element
CAUTION
Gas leakage
The filter should not be dismantled under pressure.
Don’t use damaged parts again.
– Twist off the filter cover counter-clockwise.
– Remove the filter element and insert a new one.
– Check for leaks and replace, if necessary.
– Twist on filter cover clockwise and tighten hand-tight.
– Perform a leak test with suitable means.
NOTICE! Please observe legal regulations when disposing of filter elements.
7.8 Replace Flowmeter module
– Close gas supply.
– Switch off device and disconnect all plugs (e.g. connector plug alarm output, supply input, etc.).
– Unscrew the top cover from the housing.
– Loosen all screws from the flowmeter module GM0392 and pull out the module.
– Mark the hoses at the flowmeters and remove them.
– Place the cable of the ring sensor through the housing to the upper end of the backplane and put the hoses on the extension
module DK46 SCS 104 the same way they were removed.
– Mount the extension module in the front.
– Remove the resistor from plug X10 (see picture in chapter
Replacing the fuse (F1) from the gaspumps
[> page 22]) and mount
the cables instead (polarity unimportant).
– Recover the top cover from the housing.
– Restore the power and gas supply.
– Attach the type plate to a suitable location on the back of the device.
7.9 Install Extension module gaspump
– Close gas supply.
– Switch off device and disconnect all plugs (e.g. connector plug alarm output, supply input, etc.).
– Unscrew the top cover from the housing.
– Mark the hoses at the gaspumps and remove them.
– Align the baseplate and the pump the same way as the existing ones and assemble the new ones in the same alignment.
– Mount the baseplate with pump on top of the distance bolts.
– Place the T-pieces on the open hoses and connect the pumps, each at the gasinputs and the gasoutputs together with the
PTFE-hoses.
– Place the cable from the pump to the backplane to plug X3 (see picture in chapter
Replacing the fuse (F1) from the gaspumps
[> page 22]): mount the end sleeve on cable 1 and put it in pin1 of the plug, put the double end sleeve on cable 2 together with
the connected cable 2 at pin2 and put the other double end sleeve on PE together with the connected PE and fix it in the plug.
– Remove the screws from the relayboard RB0292 and pull it out of the housing. Remove the blanking plug out of the front
plate and put the rocker switch instead of it. Put the cables the same way as the existing switch in the mountig clamp.
– Put the relayboard back in the housing and bolt it on.
– Recover the top cover from the housing.
– Restore the power and gas supply.
– Attach the type plate to a suitable location on the back of the device.
23
Bühler Technologies GmbH
BECS0031 ◦ 02/2020
Содержание SCS 104
Страница 30: ...SCS 104 9 3 Drawing 1 Flow chart 28 Bühler Technologies GmbH BECS0031 02 2020 ...
Страница 32: ...SCS 104 9 5 Drawing 3 Front view 9 6 Drawing 4 Back view 30 Bühler Technologies GmbH BECS0031 02 2020 ...
Страница 34: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......