Throw sifter
Commissioning
23
© Copyright 2018 Bühler AG
DFTA-66620-2-en-1803
5
Commissioning
Only suitably qualified and authorised personnel may start up the machine, carry
out a trial run and adjust settings.
5.1
Checks before start-up
•
All transport aids and installation fasteners have been removed.
•
The electrical installation has been carried out and checked by a qualified elec-
trician:
–
Electrical connections and connection voltages
–
Earthing of the machine
)
–
Direction of rotation of the motors
•
All operating elements and warning systems are fully functional.
•
A lockable safety switch that interrupts the power at all poles is installed and the
personnel possess a lock for this switch.
•
All screw unions are tightened securely.
•
There are no foreign objects in the machine.
•
All electrical terminal boxes and sockets are closed.
•
The correct sieves have been inserted and clamped.
•
The sieve frame must be securely fastened into the guide.
•
The sieve box must be able to move freely and may not touch the frame.
5.2
Verifying EC conformity
Within the territory of the EU, operation of the machine may begin only after its EC
conformity has been checked and confirmed in accordance with the checklist.
Checklist
1. The management has been informed that the operating instructions must be
accessible to the personnel at all times, and that management is responsible for
appropriate training of its personnel.
2. Assembly and installation are performed in accordance with the operating
instructions.
3. A lockable safety switch that interrupts the power at all poles is installed and the
personnel possess a lock for this switch.
4. There is a conductive connection between the sieve box and the frame
(earthing
.
5. The frame is connected with the equipotential bonding system
(see
)
.
6. Entry of external sources of ignition is either prevented on the installation side or
the machine is decoupled from Ex zones by means of suitable elements. The
consequences of an explosion in installation components upstream or
downstream of the machine are reduced to a manageable level with the help of
pressure relief and / or fire-extinguishing systems that are outlined in the
installation safety analysis.
Содержание DFTA 12
Страница 8: ...8 Safety Throw sifter DFTA 66620 2 en 1803 Copyright 2018 B hler AG...
Страница 15: ...Throw sifter Description 15 Copyright 2018 B hler AG DFTA 66620 2 en 1803 2 5 2 DFTA 13 Fig 2 7...
Страница 16: ...16 Description Throw sifter DFTA 66620 2 en 1803 Copyright 2018 B hler AG 2 5 3 DFTA 23 Fig 2 8...
Страница 26: ...26 Commissioning Throw sifter DFTA 66620 2 en 1803 Copyright 2018 B hler AG...
Страница 32: ...32 Operation Throw sifter DFTA 66620 2 en 1803 Copyright 2018 B hler AG...
Страница 38: ...38 Maintenance Throw sifter DFTA 66620 2 en 1803 Copyright 2018 B hler AG...
Страница 40: ...40 Decommissioning Throw sifter DFTA 66620 2 en 1803 Copyright 2018 B hler AG...
Страница 42: ...42 After sales service Throw sifter DFTA 66620 2 en 1803 Copyright 2018 B hler AG...