background image

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

BUFFALO TURBINE'S 

BT-MDC2 

ORIGINAL INSTRUCTIONS AND PARTS MANUAL 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

06/20 

-BT MAN

 

 

 

 

 

 

 

 

 

 

 

   

BUFFALO TURBINE 

 

180 Zoar Valley Road 

Springville, NY 14141 

TEL:  716 592 2700     FAX:  716 592 2460 

EMAIL:  

[email protected]

 

WEBSITE: 

www.buffaloturbine.com

 

     

 

 

Содержание BT-MDC2

Страница 1: ...E S BT MDC2 ORIGINAL INSTRUCTIONS AND PARTS MANUAL 06 20 BT MAN BUFFALO TURBINE 180 Zoar Valley Road Springville NY 14141 TEL 716 592 2700 FAX 716 592 2460 EMAIL info buffaloturbine com WEBSITE www buffaloturbine com ...

Страница 2: ... 5 0 Troubleshooting 11 6 0 Machine Specification 12 7 0 Maintenance 13 7 1 Maintenance Safety 13 7 2 Fluids 13 7 3 Service Checklist 13 Declaration of Conformity 14 Morflex Coupling Parts 15 Morflex Coupling Installation 16 BT MDC2 Parts Reference After serial 24663 17 Oscillation Attachment Kit Parts Diagram 18 Oscillation Attachment Kit Parts Reference 19 BT MDC2 Sub Assemblies 20 21 Gyratory A...

Страница 3: ...nual handy for frequent reference and to pass on to new operators or owners Call your Buffalo Turbine dealer or distributor if you need assistance information or additional copies of the manuals SERIAL NUMBER LOCATION Always give your dealer the serial number of your Monsoon when ordering parts or requesting service or other information The serial number plate s is located where indicated in the p...

Страница 4: ...nstructions is not qualified to operate the machine An untrained operator exposes themselves and bystanders to possible serious injury or death Do not modify the equipment in any way Unauthorized modification may impair the function and or safety which could affect the life of the equipment Think SAFETY Work SAFELY This Safety Alert symbol means ATTENTION BECOME ALERT YOUR SAFETY IS INVOLVED The S...

Страница 5: ... Review all safety related items annually with all personnel who will be operating or maintaining the Blower 11 Keep hands feet hair and clothing away from moving parts Operate equipment only while seated in the operator s seat 2 3 OPERATING SAFETY 1 Read and understand the Operator s Manual and all safety signs before operating servicing or adjusting 2 Before servicing or repairing Set Monsoon on...

Страница 6: ...it is sitting or blocked up firm and solid and will not tip or sink into a soft area 4 Cover with a weatherproof tarpaulin and tie down securely 5 Make sure nozzle is covered during storage 2 7 SIGN OFF FORM Buffalo Turbine recommends that anyone who will be operating and or maintaining the Buffalo Turbine Monsoon must read and clearly understand ALL Safety Operating and Maintenance information pr...

Страница 7: ... ordered Buffalo Turbine parts must be used when filing a warranty claim LIMITATIONS OF LIABILITY This warranty is expressly in lieu of all other warranties expressed or implied and all other obligations or liabilities on our part of any kind or character including liabilities for alleged representations or negligence We neither assume nor authorize any other person to assume on our behalf any lia...

Страница 8: ...________ Tire Pressure Check Model KB ________ All Decals Installed _________ Wheel Bolts ________ Review Operating and Safety Instructions _________ Belt Tension _________ Lubricate Machine ________ Guards in Place _________ Fasteners Tight _______ Trailer assembly bolts properly installed and tightened ALL 3 POINT HITCH MODELS PTO SHAFTS MUST TELESCOPE IN EVERY POSITION I have thoroughly instruc...

Страница 9: ...ATION CHECKS Efficient and safe operation of the Buffalo Turbine Blower requires that each operator reads and understands the operating procedures and all related safety precautions outlined in this section A pre operation checklist is provided for the operator It is important for both personal safety and maintaining the good mechanical condition of the machine that this checklist is followed BATT...

Страница 10: ...ch part 1707 and part 1180 Center Part 3299 with the center frame support Tighten Nyloc nuts part 1180 3 Attach 3rd Wheel Arm to 3rd Wheel Bracket See Ref 2 using part 1100 1107 2871 4 See Ref 2 Install Tire part 2019 with lug nuts part 1576 Torque lug nuts to 80 Ft Lbs 5 Attach Tow Bar Handle part 2712 using the bolt part 1444 and nyloc nut part 1180 Tighten at this time 3299 ...

Страница 11: ... 3 8 Flat Washer 1108 4 3 8 lock washer 1107 and 3 8 16 hex nuts 1155 SEE REF 5 9 Recheck all mounting bolts to assure that they are tight 10 Attach lower oscillation nozzle assembly SEE REF 6 to elbow base ring 11 Attach upper oscillation monsoon nozzle SEE REF 6 to lower oscillation nozzle assembly 12 Connect water hoses 13 Reattach positive battery cable RED and ground cable Black to proper ter...

Страница 12: ...ll eliminate unnecessary down time at the start of next season 6 Store in an enclosed building If space is not available cover with a waterproof tarpaulin and tie it down securely 7 Store the machine away from areas of human activity 8 Do not allow children to play around the stored unit 5 0 TROUBLE SHOOTING The Buffalo Turbine Monsoon uses a high volume and velocity of air to move material from o...

Страница 13: ...to side for transport 88 with wheels and handle removed Width 55 with wheels 36 5 without wheels Height 54 with wheels 46 without wheels Weight 975 lbs Electrical System 12 Volt battery 575 CCA Fuel Capacity 12 gallon Diesel Fuel only Input Power KDW1003 Kohler Engine Input RPM Up to 3600 RPM Outlet Size Approximately 12 ...

Страница 14: ...EDULED MAINTENANCE HOURS ________________________ SERVICED BY ____________________ MAINTENANCE 8 hrs or daily Remove all debris that has settled between the blower wheel fan and the stationary vanes Helps maintain peak performance Check engine oil and fill to proper level Do not overfill Check air filter and precleaner CL Clean debris from air intake and other cooling areas on the engine Check tir...

Страница 15: ...ioned complies with the requirement of the EC Machinery Directive 2006 42 EC Product Engine Monsoon Type BT MDC2 Serial Number Order Number Applicable EC Directives Machinery Directive 2006 42 EC Noise Emissions Directive 2000 14 EC Amendment 2005 88 EC Applicable Harmonized Standards BSENISO 12100 2010 ISO 3744 2010 ISO 11094 1991 With a measured sound power level of Lwa 120 dB With a guaranteed ...

Страница 16: ...s of Loctite 271 in these 2 holes 9 Install and tighten set screws in these 2 holes 10 Check and retighten the 4 bolts that hold the coupling center section in place 11 Visually inspect the unit and replace the guard DO NOT OPERATE WITHOUT THE GUARDS IN PLACE PART 1746 COUPLING COMPLETE KOHLER ENGINE Includes PN 1110 1pc 1111 1pc 1112 4pc 1113 4pc 1114 1pc 1115 1pc 1256 1pc 2869 4pc Coupling flang...

Страница 17: ...y aligned gauge should have little to no gap between itself and the shafts at any point along the gauge 6 To adjust move the engine The 2 mounting brackets have tapped holes in each corner to help support and adjust the position of the engine The 4 roll pins may need to be repositioned after alignment is completed and bolts are tightened 7 Tighten all engine bolts and recheck alignment Drill and i...

Страница 18: ...17 ...

Страница 19: ...18 ...

Страница 20: ...19 ...

Страница 21: ...20 ...

Страница 22: ...21 ...

Страница 23: ...22 ...

Страница 24: ...NG EAR PROTECTION DECAL 1 1256 MOREFLEX CENTER SECTION 1 1258 20 X HHCS 12 1259 LOCKWASHER 18 1415 FLAT WASHER 34 1444 13 X 4 HHCS 1 1540 5 16 LOCK WASHER 38 1575 BEARING CAP FOR HUB 1 1576 20 LUG NUT 12 1707 U BOLT 2 4260 GOODYEAR ORTAC HOSE 64 1772 6 GALLON FUEL TANK 1 1788 GAS TANK STRAP 4 1804 3 8 X 3 4 44 TOOTH TIMING BELT PULLEY 1 1805 3 8 X TIMING BELT 60 TOOTH 1 1813 10 32 NYLOC LOCK NUT 4...

Страница 25: ... output to 0 volts resulting in the engine s throttle be set back to low idle Pairing Transmitter TX to Receiver RX This procedure should be used to pair a single transmitter to the receiver If you need multiple transmitters paired to this Receiver contact Buffalo Turbine at 716 592 2700 for assistance The following steps will completely erase any previously stored transmitter out of the receiver ...

Страница 26: ...umber Yellow 12VDC 1 Black 0VDC Ground 2 Gray Nozzle 1 6 White Nozzle 1 9 Purple Throttle Relay 12 Green Throttle Relay 15 Receiver Part 3239 Future models will have all black wires sequentially numbered 1 12 and matching terminal numbers above Wiring Schematic for Wireless system Purple Pin 8 ...

Страница 27: ...es not contain mercury cadmium or lead and is better for the environment than older types of batteries Alkaline batteries should be disposed through local recycling stations waste dumps Contact your local government s recycling or solid waste department for more information on proper recycling of alkaline batteries in your region Improperly disposed batteries and electronics may harm public health...

Страница 28: ...grey connector plug reattach connector plug to the receiver and proceed to step 2 If wire s pull out of connector plug wire harness needs to be replaced see ref 2 2 Check Remote Transmitter by pressing each button to ensure that the light on Transmitter has a green light If the LED lights do not appear when pressing each button on the transmitter replace transmitter batteries If the LED lights sti...

Страница 29: ...y need to be replace proceed to Step 4 If proper voltage has not been verified contact Buffalo Turbine for further instructions 4 The engine should be off for the following tests Apply power to the throttle actuator directly Both wires from the throttle actuator need to be connected to the battery see ref 1 ex yellow wire to positive terminal and red wire to negative terminal Then the wires need t...

Страница 30: ...laced see ref 2 2 Check Remote Transmitter by pressing each button to ensure that the light on Transmitter has a green light If the LED lights do not appear when pressing each button on the transmitter replace transmitter batteries If a LED lights still fail to function after replacing the batteries replace the transmitter If the lights functions correctly proceed to step 3 3 Check the set screw o...

Страница 31: ...ions are secure proceed to step 5 If proper voltage has not been verified contact Buffalo Turbine for further instructions 5 Apply power to the rotation motor directly Both wires from rotation motor need to be connected to the battery Ex white to positive terminal black to negative terminal Then reverse the wire connections to the battery Ex black to positive terminal white to negative terminal If...

Страница 32: ...31 ...

Страница 33: ...32 ...

Отзывы: