1.10
BATTERY TESTING
GENERAL
Three different procedures may be performed to provide a
good indicator of battery condition: a voltage test, a conduct-
ance test, or a load test.
A battery may be tested, whether fully charged or not, via
conductance test. In order to perform a load test, however, the
battery must be fully charged.
VOLTMETER TEST
The voltmeter test provides a general indicator of battery con-
dition. Check the voltage of the battery to verify that it is fully
charged. Refer to
If the open circuit (disconnected) voltage reading is below
12.6V, charge the battery and then recheck the voltage after
the battery has set for one to two hours. If the voltage reading
is 12.8V or above, perform the
described in this section.
Table 1-11. Voltmeter Test For Battery Charge Conditions
STATE OF CHARGE
VOLTAGE (OCV)
100%
12.7
75%
12.6
50%
12.3
25%
12.0
0%
11.8
INSTALLATION
TOOL NAME
PART NUMBER
ADVANCED BATTERY CONDUCT-
ANCE AND ELECTRICAL SYSTEM
ANALYZER
HD-48053
Test the battery using the ADVANCED BATTERY CONDUCT-
ANCE AND ELECTRICAL SYSTEM ANALYZER (Part No. HD-
48053). Perform a battery test as follows:
1.
Connect the HD-48053 analyzer leads to the vehicle's
battery.
2.
Follow the instructions in the analyzer's instruction manual
to perform a battery test.
The test results will include a decision on the battery's condi-
tion, the measured state of charge and the measured CCA.
. The analyzer's printer will provide you with
a printout including one of five possible test results:
•
GOOD BATTERY - Return the battery to service.
•
GOOD-RECHARGE - Fully charge the battery and return
to service.
•
CHARGE & RETEST - Fully charge the battery and retest.
•
REPLACE BATTERY - Replace the battery and retest.
•
BAD CELL-REPLACE - Replace the battery and retest.
NOTE
A REPLACE BATTERY test result may also mean a poor
connection between the battery cables and the vehicle. After
disconnecting the battery cables from the battery, retest the
battery using the out-of-vehicle test before replacing.
ed02811
Figure 1-26. Battery Test Results Printout
LOAD TEST
To load test the battery, proceed as follows:
Disconnect negative (-) battery cable first. If positive (+)
cable should contact ground with negative (-) cable con-
nected, the resulting sparks can cause a battery explosion,
which could result in death or serious injury. (00049a)
1.
Remove battery from motorcycle.
2.
Always fully charge the battery before testing or test
readings will be incorrect. Load testing a discharged bat-
tery can also result in permanent battery damage.
3.
After charging, allow battery to stand for at least one hour
before testing.
Turn battery load tester OFF before connecting tester
cables to battery terminals. Connecting tester cables with
load tester ON can cause a spark and battery explosion,
which could result in death or serious injury. (00252a)
4.
. Connect tester leads to battery posts
and place induction pickup over negative (black) cable.
5.
Refer to
. To avoid load tester and/or battery
damage, do not leave the load tester switch turned ON
for more than 20 seconds. Load battery at 50% of CCA
rating using the load tester. Voltage reading after 15
seconds should be 9.6V or more at 70°F (21°C).
2008 Buell XB Diagnostics: Starting / Charging 1-33
Содержание 2008 XB SERIES
Страница 1: ...2008 Buell XB Models Electrical Diagnostics Manual 99493 08Y 2007 Buell Motorcycle Company ...
Страница 4: ...Blank Text Here ...
Страница 6: ...NOTES ...
Страница 14: ...NOTES ...
Страница 50: ...NOTES ...
Страница 72: ...ed01568 Figure 2 16 Checking for Leaks 2 22 2008 Buell XB Diagnostics Engine Management ...
Страница 128: ...ed01338 Figure 2 61 Speedometer Tester Part No HD 41354 2 78 2008 Buell XB Diagnostics Engine Management ...
Страница 202: ...NOTES ...
Страница 224: ...A 22 2008 Buell XB Diagnostics Appendix A Connector Repair NOTES ...
Страница 225: ...SUBJECT PAGE NO B 1 CONNECTORS B 1 B 2 WIRING DIAGRAMS B 3 APPENDIX B WIRING DIAGRAMS ...
Страница 226: ...NOTES ...
Страница 232: ...Figure B 2 Figure B 2 Main Harness Ulysses and Lightning Main Harness Ulysses and Lightning ...
Страница 234: ...Figure B 3 Figure B 3 Main Harness Firebolt Main Harness Firebolt ...
Страница 236: ...Figure B 4 Figure B 4 Engine Management Circuit All Models Engine Management Circuit All Models ...
Страница 238: ...Figure B 5 Figure B 5 Lighting Circuit Ulysses and Lightning Lighting Circuit Ulysses and Lightning ...
Страница 240: ...Figure B 6 Figure B 6 Lighting Circuit Firebolt Lighting Circuit Firebolt ...
Страница 242: ...Figure B 7 Figure B 7 Component Circuits All Models Component Circuits All Models ...
Страница 244: ...Figure B 8 Figure B 8 Horn and Instruments Circuit All Models Horn and Instruments Circuit All Models ...
Страница 246: ...Figure B 9 Figure B 9 Starting Circuit Ulysses and Lightning Starting Circuit Ulysses and Lightning ...
Страница 248: ...Figure B 10 Figure B 10 Starting Circuit Firebolt Starting Circuit Firebolt ...
Страница 250: ...Figure B 11 Figure B 11 Charging Circuits All Models Charging Circuits All Models ...
Страница 252: ...Figure B 12 Figure B 12 Heated Handlebar Grips Ulysses only Heated Handlebar Grips Ulysses only ...
Страница 266: ...B 40 2008 Buell XB Diagnostics Appendix B Wiring Diagrams NOTES ...
Страница 267: ...SUBJECT PAGE NO C 1 METRIC CONVERSION C 1 C 2 FLUID CONVERSIONS C 2 C 3 TORQUE CONVERSIONS C 3 APPENDIX C CONVERSIONS ...
Страница 268: ...NOTES ...
Страница 272: ...C 4 2008 Buell XB Diagnostics Appendix C Conversions NOTES ...
Страница 273: ...SUBJECT PAGE NO D 1 GLOSSARY D 1 APPENDIX D GLOSSARY ...
Страница 274: ...NOTES ...
Страница 278: ...D 4 2008 Buell XB Diagnostics Appendix D Glossary NOTES ...
Страница 282: ...IV TOOLS NOTES ...
Страница 284: ...VI TORQUE VALUES NOTES ...
Страница 287: ...INSIDE BACK COVER GOES HERE ...
Страница 288: ...OUTSIDE BACK COVER GOES HERE ...