Start up the heating system
Logano plus GB402 – 6 720 820 700 (2018/01)
31
7.18
Commissioning report
▶ Confirm commissioning as complete; sign and date the report.
Commissioning work
Page
Measured values
Remarks
1.
Fill the heating system and check for leaks
2.
Have the details regarding water quality in the log been observed?
Yes:
- Concentration of additives
Additives:
Concentration:
3.
Record gas parameters: Wobbe index
Calorific value
_________ kW/m³
_________ kW/m³
4.
Check the gas pipe for tightness
– Vent gas line
5.
Create operating pressure
6.
Check the ventilation and extract air apertures and the flue connection
7.
Check the system equipment level
8.
Commissioning the control unit and burner
9.
Set the gas type, if required
10.
Record actual values:
Full Load
Partial load
- Draught
______Pa
______Pa
- Gross flue gas temperature t
A
______ °C
______ °C
- Air temperature t
L
______ °C
______ °C
- Net flue gas temperature t
A
- t
L
______ °C
______ °C
- Carbon dioxide content (CO
2
) or oxygen content (O
2
)
______ %
______ %
- Flue gas losses q
A
______ %
______ %
- CO value, free of air
_____ ppm
_____ ppm
11.
Testing the gas supply pressure
____________ mbar
12.
Check for water leaks during operation
13.
Function tests
– Checking the ionisation current
____________ μA
14.
Installing casing parts
15.
Inform operator; hand over technical documentation
16.
Correct commissioning by the installing contractor
Signature:______________________
17.
User signature
Signature:______________________
Table 13 Commissioning report