background image

Users manual

Users manual Buderus 800 - 24/29/43/60 and 800 - 24T25/29T25 H/V • Edition 02/2006

3

Subject to modifications resulting from technical improvements !

 Buderus Ltd. • http://www.buderus-domestic.co.uk

Dear Customer,

Your Buderus 

800 Series 

wall-mounted condensing gas 

boiler has been designed and built in accordance with 
state-of-the-art technological standards and the recog-
nised safety rules. Special focus has been placed on 
operator convenience in this respect.
Carefully read the safety instructions and operating 
manual to ensure safe, economic and ecologically 
beneficial use of the unit.
Due to the high efficiency of the boiler a plume of water 
vapour may form at the terminal during operation. 
This is normal.

1

Safety instructions

A

DANGER!
If you smell gas

:

1. No naked flames ! Do not smoke !
2. Avoid sparks !

Do not operate electrical switches.
Do not use the telephone, plug-in devices of 
any kind or the doorbell!

3. Shut off the main gas supply!
4. Open windows and doors!
5. Warn building occupants and evacuate the

building!

6. Call TRANSCO (under 'GAS' in the telephone 

directory) from outside the building!

I

NOTE

In the event of any other type of incident, shut off 
the main gas supply and electric supply to the 
appliance and seek assistance from a CORGI 
registered engineer.

2

Installation area / boiler 
room

A

DANGER!

The air intake and outlet openings must not be 
reduced in size or closed.

A

DANGER!

Do not store or use inflammable materials or 
liquids near the heating boiler.

I

NOTE

To prevent the boiler from being damaged, care 
must be taken not to contaminate the 
combustion air with halogenated hydrocarbons 
(e. g. contained in aerosol sprays, solvents, 
detergents, paints, and adhesives), or with high 
quantities of dust. The room in which the boiler 
is installed must be frost-proof and be well 
ventilated.

3

Working in the heating 
system

A

DANGER !

Only a CORGI registered Engineer is to be 
entrusted with the installation of this boiler, the 
gas supply and the flue connection. 
Commissioning, Servicing and any Repairs 
must be carried out by a competent person ie: 
a CORGI Registered Engineer. 
All CORGI Registered Installers carry a CORGI 
identification card and have a registration 
number. Both should be recorded in your boiler 
logbook. You can check your installer/Engineer 
is registered by telephoning 01256 372300 or by 
writing to:
CORGI, 1 Elmwood, Chineham Business Park, 
Crockford Lane, Basingstoke. RG24 8WG

I

NOTE

It is mandatory to clean and service the system 
once a year ! This includes an inspection of the 
entire system to see if it is in full working order. 
Any faults and defects found in the course of 
inspection must be rectified immediately.

It is recommended to enter into a service contract with 
a specialist company.

4

Functions of the system 
and operating instructions

The installer should familiarize the user with the 
functions and operation of the heating system and 
ensure that a complete set of technical documentation is 
supplied.

5

Maintenance

The appliance should be serviced at least once a year 
by a CORGI registered installer.

Содержание 800 - 24

Страница 1: ...7212 3700 02 2006 GB EN For the user Please read thoroughly before operating the unit Users manual Gas wall hung Boiler condensing Buderus 800 24 29 43 60 and Buderus 800 24T25 29T25 H V...

Страница 2: ...tallation and Use Regulations The Building Regulations current I E E Wiring Regulations and the relevant British Standard Codes of Practice The device may only be used in combination with the units ac...

Страница 3: ...ammable materials or liquids near the heating boiler I NOTE To prevent the boiler from being damaged care must be taken not to contaminate the combustion air with halogenated hydrocarbons e g containe...

Страница 4: ...ns switch fig 1 item 5 into position I The boiler runs through the start up program and the burner is ignited after approx 30 seconds z Close the control panel cover z Use the control unit or remote c...

Страница 5: ...Move the mechanical switch on the three way valve to centre position fig 2 applicable for 24T25 and 29T25 only and systems with an external storage type water heater z Connect temporary hose of the fi...

Страница 6: ...three start up trials 7 Shutting down the boiler z Open the control panel cover z Turn the mains switch fig 6 item 1 into position 0 z Close the gas service valve by turning it to the right fig 6 ite...

Страница 7: ...5 H V Edition 02 2006 7 Subject to modifications resulting from technical improvements Buderus Ltd http www buderus domestic co uk z Place hose on the draining tule z Turn to drain the system Fig 6 Ma...

Страница 8: ...buderus domestic co uk Buderus is a trading name of BBT Thermotechnology UK Ltd Customer Services Technical Product Support Sales Returns Spares Tel 0870 421 5933 Tel 0870 421 5944 Tel 01905 752 640 T...

Отзывы: