Users manual
Users manual for Buderus 500-24S • 07/2007
5
Subject to modifications resulting from technical improvements
Buderus • http://www.buderus.co.uk
8
Permanent clearances
The boiler must be located in an area with the following perma-
nent clearances.
5 mm
5 mm
8 mm
21 mm
21 mm
NOTE
The permanent clearances do not change if a
wall-spacing frame is used.
The installer or service engineer must be able
to create sufficient service clearences. These
clearences should have been considered at
time of installation.