Operation
6.1
Preparing for operation
Before commissioning, the following points should be checked and dealt with:
u
Installation site: set up the Recirculating Chiller on a firm surface. Leave sufficient
clearance from other equipment and walls. See Chapter 5.2 "Installation site",
page 20.
u
Lock the front castors on the F-308 and F-314.
u
Power supply: connect the Recirculating Chiller to the power supply. See
Chapter 5.3 "Connecting the F-3xx to the power supply", page 21.
u
Control system: if necessary, connect the Recirculating Chiller to a BUCHI
interface. See Chapter 5.4.2 "Connecting the communication cable to the F-3xx",
page 24.
u
Tubing: correctly connect theRecirculating Chiller to the other laboratory equip-
ment. See Chapter 5.4.3 "Connecting the coolant tubing to the F-3xx", page 25.
u
Coolant: fill the coolant tank of the Recirculating Chiller with a sufficient quantity of
the correct coolant. See Chapter 5.5 "Filling and draining the coolant tank",
page 27.
6.2
Commissioning the recirculating chiller
CAUTION
Risk of property damage
u
Make sure that no objects are lying on the device or are placed on the device
while it is in operation.
off
Set
°C
°C
START
1
2
6
4
5
3
Fig. 17: Display
1 Operating status
4 Connection symbol – device is being
controlled via a BUCHI interface
2 Actual temperature
5 Options activated if control knob is
pressed
3 Set temperature locked
6 Set temperature
Precondition:
R
Device is ready for operation (see Chapter 6.1 "Preparing for operation",
page 29).
u
Set the required temperature, see Chapter 6.3 "Operating chiller without control
system (interface)", page 30 or Chapter 6.4 "Operating chiller with Interface
I-300/I-300 Pro", page 31.
u
Press control knob/START button (on Interface I-300) to start the chilling process.