Installation Instructions
© BTG 2019
User Manual CPM II2066en Rev.B
19
2.5.3
FCM-8000 / 8010 Connections
NOTE!
Before installation, ensure that all power to the system has been turned off.
Cable connections must be made by authorized personnel.
1. Insert the signal cables through the cable glands.
2. Connect the cables to the FCM-80xx as shown in Fig 11 or Fig 13.
NOTE!
The connection blocks can be released from the connection module for easier
access, as shown in Fig 14 below.
3. Connect the shield to the upper connection point on the shield filter module.
CAUTION!
The cable shield must always be connected to the upper connection point on
the shield filter module, and kept separated from the transmitter cable shield.
DANGER
Hazardous voltage
in the equipment
Fig 14 Releasing the
connection blocks
Содержание CPM 1300
Страница 1: ...User Manual CPM Communication Platform ...
Страница 32: ...Service Instructions 28 User Manual CPM SI2066en Rev A BTG 2019 ...
Страница 43: ......
Страница 44: ...BTG Instruments AB P O Box 602 SE 661 29 Säffle Sweden Phone 46 533 426 00 www btg com ...