BWS Series Indicator Technical Manual
- 4 -
3. INSTALLATION
Installation
•
Place the Indicator on a table or connect to the supplied mounting bracket.
•
Connect the load cell cable to the indicator Bd9 load cell connecter.
•
Plug equipment into an easily accessible outlet with a protective ground/
earth contact.
•
Turn BWS on with use of the On/Off key. If you want to turn off, press this
key again.
•
Display will start self checking/ followed by number of calibrations/ number
of option changes/ then error 4/ Then enter into main weighing screen.
•
Warm-up time of 15 minutes helps stabilizes the measured values after
switching on.
•
Calibrate with exact calibration weights, a minimum 1/3 of the scale
capacity should be used for calibration. For calibration instructions see
details under parameters.
Wiring
Supplied 18 foot cable (to load cells) Self made cable (from BWS)
SIG-
Green
SIG+
White
EX-
Black
EX+
Blue
SEN-
Yellow
SEN+
Red
Shield
Grey
SEN and EX needs to be tied
Together if no sense wires..
Terminal strip and Cut pigtail wiring on the next page
Pins to DB9
1
SIG-
2
SIG+
3
EX+
4
EX-
5
SEN+
6
Connect to 7
7
Connect to 6
8
SEN-
9
Shield
Содержание WorldWEIGH BWS Series
Страница 1: ...V1 09p BWS Series Indicator Technical Manual 800 000316 ...
Страница 2: ......
Страница 23: ...BWS Series Indicator Technical Manual 20 9 DRAWING 9 1 BWS Drawing ...