BSi iODIN Скачать руководство пользователя страница 2

2

 

Headquarters :

 Konutkent Mah. 3029 Cad. No:3/91 06810 Çankaya Ankara/TURKEY

 

 

Phone :

 +90 312 472 42 50

   

Fax : 

+90 312 502 74 75

   

Email :

 [email protected]

ODIN INSTALLATION GUIDE

1) - The g jons are screwed  nto the anchor.
    - The prepared anchorage  s embedded  n the concrete.

G jon

Anchor

M n 30mm

Incom ng 
energy
hose

Outgo ng 
energy
hose

30cm

25cm

25cm

Concrete

G jons should be m n
30mm above the anchorage

2) After the concrete has been dr ed, the electr cal cables are pulled.

Incom ng 
energy
cable

Outgo ng 
energy
cable

Concrete

Concrete

Отзывы: