![BSi iODIN Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/bsi/iodin/iodin_installation-manual_2823445002.webp)
2
Headquarters :
Konutkent Mah. 3029 Cad. No:3/91 06810 Çankaya Ankara/TURKEY
Phone :
+90 312 472 42 50
Fax :
+90 312 502 74 75
Email :
ODIN INSTALLATION GUIDE
1) - The g jons are screwed nto the anchor.
- The prepared anchorage s embedded n the concrete.
G jon
Anchor
M n 30mm
Incom ng
energy
hose
Outgo ng
energy
hose
30cm
25cm
25cm
Concrete
G jons should be m n
30mm above the anchorage
2) After the concrete has been dr ed, the electr cal cables are pulled.
Incom ng
energy
cable
Outgo ng
energy
cable
Concrete
Concrete