
3-1
4-1
Open the front cover.
Drilling after measuring the hole.
Install with screws aligning to the located hole.
Plug with driver, cover with the front cover.
with max 3 lights and 2m cable can be connected.
t
Connect the lights in turns.
Light
Screw
PIR
Detection beam 30°
Delay time 45s
Induction distance 1-3mt
Middle position fix at approx 4-5cm
4-5cm
30°