
41
S
Airflow:
Selectable from Off to Max in 50 CFM increments
d
Off = 450 CFM, MAX = (odu_size in KBTU * 400) / 12)
d
Default = Off
S
Blower On Delay:
Selectable from 0 to 240 seconds
d
Default = 30 seconds
S
Blower Off Delay:
Selectable from 0 to 240 seconds
d
Default = 0 seconds
6.4.
Check out
Touch
CHECKOUT
to view the equipment installed in the system. Perform
checkout test to make sure each piece of equipment is operating properly.
A12195
Содержание Evolution Connex SYSTXBBECN01
Страница 2: ......
Страница 77: ...69 R G FE Fan Coil or Variable Speed Furnace A07114 G Input Wiring for Blower Operation ...
Страница 78: ...70 R G FE Fan Coil or Variable Speed Furnace A07115 G Input Wiring for System Shutdown ...
Страница 79: ......