![Bryant 580J*04A Скачать руководство пользователя страница 46](http://html1.mh-extra.com/html/bryant/580j-04a/580j-04a_installation-instructions-manual_2822120046.webp)
46
Fig. 63 — Return Air Smoke Detector; Shipping
Position
Completing Installation of Return Air Smoke Sensor
1. Unscrew the two screws holding the Return Air Smoke
Detector assembly. See Fig. 64, Step 1. Save the
screws.
2. Turn the assembly 90 and then rotate end to end. Make
sure that the elbow fitting is pointing down. See Fig. 64,
Step 2.
3. Screw the sensor and detector plate into its operating po-
sition using screws from Step 1. See Fig. 64, Step 3.
4. Connect the flexible tube on the sampling inlet to the
sampling tube on the basepan.
Additional Application Data — Refer to Catalog No. HKRN-
KA-1XA for discussions on additional control features of these
smoke detectors including multiple unit coordination.
Fig. 64 — Completing Installation of Return Air Smoke Sensor
Return Air
Smoke Detector
(as shipped)
Step 1
Step 2
Step 3
Содержание 580J*04A
Страница 4: ...4 Fig 2 Unit Dimensional Drawing ...
Страница 5: ...5 Fig 2 Unit Dimensional Drawing cont ...
Страница 21: ...21 Fig 34 580J Size 07 Unit with Perfect Humidity Dehumidification System Humidistat Wiring ...
Страница 37: ...37 Fig 43 Typical RTU Open System Control Wiring Diagram ...
Страница 38: ...38 Fig 44 Typical RTU Open System Control Wiring Diagram with Perfect Humidity ...
Страница 49: ......