26
The high static option supply fan motor is equipped with a pi-
lot-circuit Thermix combination over-temperature/over-current
protection device. This device resets automatically. Do not by-
pass this switch to correct trouble. Determine the cause and
correct it.
CONDENSER FAN MOTOR PROTECTION
The condenser fan motor is internally protected against over-
temperature.
Relief Device
A soft solder joint at the suction service access port provides
pressure relief under abnormal temperature and pressure condi-
tions (i.e., fire in building). Protect this joint during brazing op-
erations near this joint.
Control Circuit, 24-V
The control circuit is protected against overcurrent conditions
by a circuit breaker mounted on control transformer TRAN.
Reset is manual.
RTU OPEN CONTROL SYSTEM
The RTU Open controller is an integrated component of the
Bryant rooftop unit. Its internal application programming pro-
vides optimum performance and energy efficiency. RTU Open
enables the unit to run in 100% stand-alone control mode or a
Third Party Building Automation System (BAS). On-board
DIP switches allow the user to select your protocol (and baud
rate) of choice among the four most popular protocols in use
today: BACnet, Modbus
1
, Johnson N2 and LonWorks
2
. See
Fig. 48.
The RTU Open control is factory-mounted in the unit’s main
control box, to the left of the UCB (unit control board). Factory
wiring is completed through harnesses connected to the UCB.
Field connections for RTU Open sensors will be made at the
PCB connectors on the RTU Open board. The factory-installed
RTU Open control includes the supply-air temperature (SAT)
sensor. The outdoor air temperature (OAT) sensor is included
in the FIOP/accessory EconoMi$er
®
2 package.
Fig. 48 — RTU Open Control Module
1. LonWorks is a registered trademark of Echelon Corporation.
2. Modbus is a registered trademark of Schneider Electric.
J4
J2
J1
J5
J5
J22
J17
J19
J14
J11
J22
J3
J13
J12
J15
J20
Network Comm
Configurable - Input_8
24 V
A
C
Configurable - Input_5
24 V
A
C
Configurable - Input_3
24 V
A
C
Input_9 (Humidistat)
24 V
A
C
24 V
A
C
Input _8 (Enthalpy)
AO-1 (ECON)
Gnd
(OA
T
)
Gnd
(SA
T)
Input_5 (SMK)
Input_4
(R)
BO-5
(Y1)
BO-4
(Y2)
BO-3
(W1)
BO-2
(W2)
BO-1
(G)
Gnd
Input_3
(X)
24 V
AC IN
+24 VDC
Input_2 (CO2/RH)
Gnd
+24 VDC
Input_1 (CO2/RH)
Gnd
Board Power
(AO-1)
0-10VDC
4-20mA
BO-6
(H) Humidimizer
BO-8
(Power Exhaust)
LonWorks
Option Card
Port
Example set for
BACnet MS/TP
and 76.8K baud
(1, 2, and 4 ON)
Recommended for all
i-Vu Open installations
Protocol Selector
SPT (temp input)
BACnet, Modbus, or N2
(LON connection J15)
SPT (common)
SPT (offset input)
*Remove
both for 0-5V
AO-2
GND
(2-10V)
3-Volt
Lithium
Battery
BO-1
BO-2
BO-3
BO-4
BO-5
BO-6
BO-7
BO-8
VAF Output
Содержание 551K 04N Series
Страница 15: ...15 Fig 27 Condenser Fan Assembly Screw Pattern Sequence 1 2 3 4 5 NO SCREW Blank Tab ...
Страница 82: ...82 APPENDIX D WIRING DIAGRAMS Fig E 551K 04 06 208 230 1 60 Unit with RTU Open Controller ...
Страница 83: ...83 APPENDIX D WIRING DIAGRAMS Fig F 551K 04 06 208 230 3 60 Unit with RTU Open Controller ...
Страница 84: ...84 APPENDIX D WIRING DIAGRAMS Fig G 551K 04 06 460 575 3 60 Unit with RTU Open Controller ...
Страница 85: ...85 APPENDIX D WIRING DIAGRAMS Fig H 551K 04 06 Power Wiring Diagram 208 230 1 60 ...
Страница 86: ...86 APPENDIX D WIRING DIAGRAMS Fig I 551K 04 06 Power Wiring Diagram 208 230 3 60 ...
Страница 87: ...87 APPENDIX D WIRING DIAGRAMS Fig J 551K 04 06 Power Wiring Diagram 460 575 3 60 ...
Страница 89: ......