4
CLEARANCE TO COMBUSTIBLES
UNIT APPLICATION
UPFLOW
DOWNFLOW
HORIZONTAL
SIDES
Furnace
0
2
2
Supply Plenum and Warm---Air Duct Within 6 Ft
of Furnace
1
2
1
BACK
Furnace
0
1
0
TOP
Furnace Casing or Plenum
2
2
2
Horizontal Warm---Air Duct Within 6 Ft of
Furnace
2
2
3
BOTTOM
Furnace
0
0*
0*
FLUE PIPE
Horizontally or Below Pipe
4
4
4
Vertically Above Pipe
9
9
9
FRONT
8
8
24
*For combustible floor, use approved accessory subbase.
NOTE: Adequate service clearance should be provided over and above these dimensions as required.
PHYSICAL DATA
UNIT SIZE
036105
060120
INPUT (BTUH)
70,000
91,000
105,000
119,000
140,000
154,000
HEATING CAPACITY (BTUH)*
57,000
74,000
85,000
97,000
115,000
126,000
NOZZLE
0.50 --- 70W
0.55 --- 70B
0.65 --- 70B
0.75 --- 70B
0.85 --- 70B
0.85 --- 70B
FIRING RATE (GPH)
0.50
0.65
0.75
0.85
1.00
1.10
AFUE%
UPFLOW
80.5
80.5
80.5
80.5
80.5
80.5
DOWNFLOW
80
80
80
80
80
80
HORIZONTAL
80
80
80
80
80
80
OIL PUMP STAGES/PRESSURE
(PSIG)
1/100
1/140
1/130
1/130
1/140
1/170
HEATING TEMP RISE
_
F
55---85
55---85
55---85
55---85
55---85
55---85
COOLING CFM @ 0.5---IN. WC
STATIC PRESSURE
1250
1250
1250
1865
1865
1865
HEATING CFM @ 0.2---IN. WC
STATIC PRESSURE
840
1130
1425
1220
1535
1890
RECOMMENDED HEATING
BLOWER SPEED
Med---Low
Med---High
High
Med---Low
Med---High
High
SHIPPING WEIGHT (LB)
235
235
235
260
260
260
BURNER MODEL (3450 RPM)
{
BECKETT
AFG---F3
BECKETT
AFG---F3
BECKETT
AFG---F3
BECKETT
AFG---F3
BECKETT
AFG---F3
BECKETT
AFG---F6
* Capacity and AFUE in accordance with U.S. Government DOE test procedures.
{
Beckett AFG---F6 requires field---supplied and replacement burner firing head.
Shaded cells are as factory shipped.
369AAN