Check Charge

The 127A units may be charged in high-- or low--stage compressor
operation. Factory charge amount and desired subcooling are

shown on unit rating plate. Charging method is shown on

information plate inside unit. To properly check or adjust charge,
conditions must be favorable for subcooling charging. Favorable

conditions exist when the outdoor temperature is between 70

_

F

and 100

_

F (21.11

_

C and 37.78

_

C), and the indoor temperature is

between 70

_

F and 80

_

F (21.11

_

C and 26.67

_

C). Follow the

procedure below:
Unit is factory charged for 15ft (4.57 m) of lineset. Adjust charge

by adding or removing 0.6 oz/ft of 3/8 liquid line above or below
15ft (4.57 m) respectively.
For standard refrigerant line lengths (80 ft/24.38 m or less), allow
system to operate in cooling mode at least 15 minutes. If conditions

are favorable, check system charge by subcooling method. If any

adjustment is necessary, adjust charge slowly and allow system to
operate for 15 minutes to stabilize before declaring a properly

charged system.
If the indoor temperature is above 80

_

F (26.67

_

C), and the

outdoor temperature is in the favorable range, adjust system charge

by weight based on line length and allow the indoor temperature to
drop to 80

_

F (26.67

_

C) before attempting to check system charge

by subcooling method as described above.
If the indoor temperature is below 70

_

F (21.11

_

C), or the outdoor

temperature is not in the favorable range, adjust charge for line set
length above or below 15ft (4.57 m) only. Charge level should then

be appropriate for the system to achieve rated capacity. The charge

level could then be checked at another time when the both indoor
and outdoor temperatures are in a more favorable range.

NOTE

: If line length is beyond 80 ft (24.38 m) or greater than 20

ft (6.10 m) vertical separation, See Long Line Guideline for
special charging requirements.

Final Checks

IMPORTANT

: Before leaving job, be sure to do the following:

1. Ensure that all wiring is routed away from tubing and sheet

metal edges to prevent rub--through or wire pinching.

2. Ensure that all wiring and tubing is secure in unit before

adding panels and covers. Securely fasten all panels and

covers.

3. Tighten service valve stem caps to 1/12--turn past finger

tight.

4. Leave Owner’s Manual with owner. Explain system opera-

tion and periodic maintenance requirements outlined in

manual.

5. Fill out Dealer Installation Checklist and place in customer

file.

TROUBLESHOOTING

If the compressor fails to operate with a cooling call, the table
below (Resistance table) can be used to verify if there is any

damage to the compressor windings causing system malfunction.

Table 3 – Winding Resistance

Winding

Winding resistance at 70

_

F +/--- 20

_

F

(21.11

_

C +/--- 11.11

_

C)

127A024

127A036

127A048

127A060

Start

(S---C)

2.74

1.98

1.55

0.6

Run

(R---C)

0.8

0.75

0.48

0.49

Troubleshooting 127A units for proper switching

between low-- and high--stages

Check the suction pressures at the service valves. Suction pressure

should be reduced by 3--10% when switching from low to high
stage.

NOTE

: The liquid pressures are very similar between low-- and

high-- stage operation, so liquid pressure should not be used for
troubleshooting.
Compressor current should increase 20 to 45% when switching

from low to high stage. The compressor solenoid when energized
in high stage, should measure 24vac. When the compressor is

operating in low stage, the 24v DC compressor solenoid coil is
de--energized. When the compressor is operating in high stage, the

24v DC solenoid coil is energized.
The solenoid plug harness that is connected to the compressor has

an internal rectifier that converts the 24v DC signal to 24v AC.

DO NOT INSTALL A PLUG WITHOUT AN INTERNAL

RECTIFIER.

Unloader Test Procedure:

The unloader is the compressor internal mechanism, controlled by

the DC solenoid, that modulates between high-- and low--stage. If
it is suspected that the unloader is not working, the following

methods may be used to verify operation:

1. Operate the system and measure compressor amperage.

Cycle the unloader on and off at 30 second plus intervals at
the thermostat (from low-- to high--stage and back to low--

stage). Wait 10 seconds after staging to high before taking a
reading. The compressor amperage should go up or down at
least 20 percent.

2. If step one does not give the expected results, remove the

solenoid plug from the compressor and, with the unit run-

ning and the Thermostat calling for high--stage, test the
voltage output at the plug with a DC voltmeter. The reading
should be 24 volts DC.

3. If the correct DC voltage is at the control circuit molded

plug, measure the compressor unloader coil resistance. The

resistance should be 32 to 60 ohms depending on com-
pressor temperature. If the coil resistance is infinite, much

lower than 32 ohms, or is grounded, the compressor must
be replaced.

127A

Содержание 127A

Страница 1: ... the OFF position There may be more than 1 disconnect switch Lock out and tag switch with a suitable warning label INSTALLATION INSTRUCTIONS NOTE In some cases noise in the living area has been traced to gas pulsations from improper installation of equipment 1 Locate unit away from windows patios decks etc where unit operation sound may disturb customer 2 Ensure that vapor and liquid tube diameter...

Страница 2: ...7_C when operating voltage is 230v For 208v applications the maximum outdoor ambient is 120_F NOTE Units operating at high stage operation 208v or below line voltage and at an outdoor ambient 120_F or greater may experience compressor trip NOTE This product is not approved for low ambient cooling at this time and no low ambient kit is available Make Piping Connections WARNING PERSONAL INJURY AND E...

Страница 3: ...ptions on 18 42 size units see Product Data or Residential Piping and Application Guideline Install Liquid Line Filter Drier Indoor CAUTION UNIT DAMAGE HAZARD Failure to follow this caution may result in equipment damage or improper operation 1 Installation of filter drier in liquid line is required 2 Filter drier must be wrapped in a heat sinking material such as a wet cloth while brazing Refer t...

Страница 4: ...with thermostat Use No 18 AWG color coded insulated 35_C minimum wire If thermostat is located more than 100 ft 30 48 m from unit as measured along the control voltage wires use No 16 AWG color coded wire to avoid excessive voltage drop All wiring must be NEC Class 1 and must be separated from incoming power leads Use furnace transformer fan coil transformer or accessory transformer for control po...

Страница 5: ...and second stage cooling are satisfied the compressor will shut off Therefore with first stage of cooling Y1 is powered on and with second stage of cooling Y1 and Y2 are powered on When a 2 stage unit is operating at low stage system vapor suction pressure will be higher than a standard single stage system or high stage operation Compressor Operation on 127A Models The basic scroll design has been...

Страница 6: ...d periodic maintenance requirements outlined in manual 5 Fill out Dealer Installation Checklist and place in customer file TROUBLESHOOTING If the compressor fails to operate with a cooling call the table below Resistance table can be used to verify if there is any damage to the compressor windings causing system malfunction Table 3 Winding Resistance Winding Winding resistance at 70_F 20_F 21 11_C...

Страница 7: ...has a 24 volt coil and is controlled by Y1 input from the thermostat High and Low Pressure Switches High and low pressure switches are provided in line with the Y1 signal to the contactor for protection The high pressure switch mounted on the liquid tube is set to open at 670 psi and higher and the low pressure switch mounted on the suction tube opens at a pressure of 50 psi and lower CARE AND MAI...

Страница 8: ...HUMIDIFY MODES Two Stage Air Conditioner Thermidistat Variable Speed Fan Coil TWO STAGE AIR CONDITIONER THERMIDISTAT Thermidistat Models T6 PRH 01 TP NRH 01 w Variable Speed Fan Coil 2 Stage Air Conditioner Thermidistat Model TSTATBBPRH01 B w Variable Speed Furnace 2 Stage Air Conditioner Fig 6 Thermidistat Wiring with 2 Stage Puron refrigerant Air Conditioner A09278 Single Stage Furnace with 2 St...

Страница 9: ... liquid line filter driers with rated working pressures less than 600 psig S Do not leave Puron suction line filter driers in line longer than 72 hours S Do not install a suction line filter drier in liquid line S POE oils absorb moisture rapidly Do not expose oil to atmosphere S POE oils may cause damage to certain plastics and roofing materials S Wrap all filter driers and service valves with we...

Страница 10: ...or change at any time specifications or designs without notice and without incurring obligations E2009 Bryant Heating Cooling Systems D 7310 W Morris St D Indianapolis IN 46231 Printed in U S A Edition Date 12 09 Replaces New Catalog No II127A 01 127A ...

Отзывы: