3.3 SYSTEM CLEAN OUT
Many boilers have been ruined with system contaminants such as pipe dope, cutting oil, metal
shavings or chips and other debris which are left in the piping. If these contaminants are not
removed, they will end up in the boiler.
3 . 3 . 1 S Y S T E M C L E A N I N G P R O C E D U R E
For steam systems, the boiler will need to be connected to the header utilizing steam to purge the
piping and thus push the debris out of the system. However, at this time all condensate must be
wasted until it runs clear and water analysis of the condensate indicates that it is free of
contaminants. Steam trap strainers must be periodically opened and cleaned of any debris which
accumulates. During this system clean out, the boiler make-up water must be properly softened
and treated. At the conclusion of the system clean out, the condensate must be reconnected.
For old or existing steam systems, the installation process may have jarred debris loose.
Following the boil out of the new boiler, the condensate should be wasted until it is within proper
guidelines. Check all steam trap strainers to assure their cleanliness. Refer to the succeeding
section on replacement boiler installations.
3.4 REPLACEMENT BOILER INSTALLATIONS: PROTECTION
AGAINST CORROSION & SEDIMENT
3 . 4 . 1 C L E A N O R R E P L A C E A L L S Y S T E M P I P I N G
A N D H E A T I N G U N I T S
Arrange for chemical or mechanical cleaning of the entire system. A chemical treatment company
should be consulted for the proper means of any chemical cleaning.
Replace any piping considered to be deteriorated beyond safe or cleanable condition.
Flush the system clean, being certain to isolate the boiler.
Inspect, repair as necessary, or replace system air control devices.
Install gauge glasses on air expansion tanks and install a tank fitting in the system connection
to the tank.
Install a strainer in boiler return piping.
DO NOT FLUSH THE SYSTEM THROUGH THE BOILER.