Bandit
Copyright 5/09
PAGE
MODELS 2000XP / 2100SP
TRANSPORTATION PROCEDURES
LOADING & UNLOADING
WARNING
BEFORE LOADING OR UNLOADING THE MACHINE INSPECT AND CONFIRM THE FOLLOWING
STEPS:
When loading or unloading the self-propelled machine on the trailer, use care and caution. The
maneuvering of the equipment must be slow, smooth, and intentional, not fast and jerky.
1) Make sure the trailer and towing vehicle are parked on a flat surface. They must be stable on the
surface with the brakes locked and/or the wheels chocked to avoid unwanted movement.
) Position the loading ramps or loading gate securely between the trailer and the ground level. Have them
located so that they are in line with the tires or tracks of the machine when it moves.
) Remove and store the chains and binders used for transporting.
4) Confirm that there are not any obstacles on the trailer bed, around the trailer that may cause restricted
movement of the machine or the operator.
5) The only person in the area should be the one that is operating the machine controls, and he/she should
be very experienced with the controls on this machine.
6) If you are on streets, roads or public areas, position the warning cones etc, per your company’s safety policy.
7) Follow all pre-startup instructions for the machine.
8) Once the engine is running at as low a speed as possible, carefully raise the cutterwheel slightly up off
the ground or trailer bed. While loading or unloading the stump grinder, the cutterwheel should not be
raised any higher than necessary to just clear whatever is under it. You need to keep the weight center
of gravity as low as possible to avoid tipping the machine while it is moving.
9) The cutterwheel end of the stump grinder should always be positioned so that it is toward the rear of the
trailer, not the tongue, during transport.
10) When the machine is positioned on the trailer bed, there should be about 15% of the total trailer package
weight on the tongue or hitch.
11) Align the machine with the trailer bed, and the loading ramps. The only equipment movement should be
slowly, straight on or straight off the trailer.
12) With the engine and the machine at as low of speed as possible, move the machine toward the ramp
system. Make sure the alignment is correct throughout the travel, and carefully readjust the cutter
wheel height so that it barely clears obstacles as it is going up or down the ramp system.
) Properly secure the equipment and the area to avoid any possible accidents or dangers.
14) The trailer should be constructed with appropriate chain down positions for the specific sized stump
grinder. You must have binders that will withstand the strain of the machine trying to move while it is
being transported.
5) The loading ramps or loading gate of the trailer must be constructed to withstand the weight and forces
involved in loading and unloading the machine.
Содержание 2000XP
Страница 2: ......
Страница 6: ......
Страница 140: ...Bandit Copyright 5 09 PAGE 134 MODELS 2000XP 2100SP SERVICE RECORD SERVICE RECORD DATE DESCRIPTION AMOUNT...