12
MINI assembly
instructions
Step 1
Step 2
Brula dipping cement is applied to all the surfaces of the firebox components
(except the base stone).
Caution: Place the calcium silicate tape in the gaps between the ceramic
components and the platform/door to enable optimal elongation.
Step 3
Step 4
Caution! Adhesive grout it applied to the front.
A space of 0.5 - 1 cm is left between the firebox and cladding.
The front elements are only adhered to the mantel stone with adhesive
grout.