background image

Introduction

Z33119_2_003

17

3.3

Installation and Initial Commissioning

Installation, initial commissioning, retrofitting, repairs, adjustments or dismantling of the
device must only be carried out by Bruker Service or personnel authorized by Bruker.
Damage due to servicing that is not authorized by Bruker is not covered by your warranty.

3.4

Limitation of Liability

All  specifications  and  instructions  in  this  manual  have  been  compiled  taking  account  of
applicable standards and regulations, the current state of technology and the experience and
insights we have gained over the years.

The manufacturer accepts no liability for damage due to:

• Failure to observe this manual.

• Improper use.

• Deployment of untrained personnel.

• Unauthorized modifications.

• Technical modifications.

• Use of inadmissible spare parts.

The actual scope of supply may differ from the explanations and depictions in this manual in
the case of special designs, take-up of additional ordering options, or as a result of the latest
technical modifications.

The  undertakings  agreed  in  the  supply  contract,  as  well  as  the  manufacturer's  Terms  and
Conditions  and  Terms  of  Delivery,  and  the  legal  regulations  applicable  at  the  time  of  the
conclusion of the contract shall apply.

3.5

Copyright

All rights reserved. This manual is protected by copyright and intended solely for internal use
by customers.

This manual must not be made available to third parties, duplicated in any manner or form –
whether in whole or in part – and the content must not be used and/or communicated, except
for internal purposes, without the written consent of the manufacturer.

Product names used are trademarks

TM

 or registered trademarks

®

 of their respective holders.

Violation of the copyright will result in legal action for damages. We reserve the right to assert
further claims.

3.6

Warranty Terms

The warranty terms are included in the manufacturer's Terms and Conditions.

3.7

Customer Service

Our  customer  service  division  is  available  to  provide  technical  information.  See  the  chapter
Contact for contact information.

In addition, our employees are always interested in acquiring new information and experience
gained  from  practical  application;  such  information  and  experience  may  help  improve  our
products.

Содержание SmartCooler BCU I

Страница 1: ...SmartCooler BCU I User Manual Version 003 Innovation with Integrity NMR...

Страница 2: ...r registered trademarks of their re spective holders This manual was written by Documentation Group April 06 2018 Bruker Corporation Document Number Z4D12628B P N Z33119 For further technical assistan...

Страница 3: ...al Data 14 3 2 1 General Information 15 3 3 Installation and Initial Commissioning 17 3 4 Limitation of Liability 17 3 5 Copyright 17 3 6 Warranty Terms 17 3 7 Customer Service 17 4 Transport Packagin...

Страница 4: ...38 9 Troubleshooting 39 9 1 Problems Solutions 40 10 Replacement of Parts 43 10 1 Returning the Unit for Repair 43 11 Dismantling and Disposal 45 11 1 Dismantling 45 11 2 Disposal Europe 45 11 3 Disp...

Страница 5: ...y instructions are introduced using indicative words which express the extent of the hazard In order to avoid accidents personal injury or damage to property always observe safety instructions and pro...

Страница 6: ...ction SAFETY INSTRUCTIONS SAFETY INSTRUCTIONS are used for control flow and shutdowns in the event of an error or emergency This is the consequence of not following the safety instructions 1 This is a...

Страница 7: ...m owner of the device must therefore comply with statutory occupational safety requirements In addition to the safety instructions in this manual the safety accident prevention and environmental prote...

Страница 8: ...onsible for providing facilities according to the local regulations for the prevention of industrial accidents and generally accepted safety regulations according to the rules of occupational medicine...

Страница 9: ...pply before opening the device Use a voltmeter to verify that the device is not under power u Be sure that the power supply cannot be reconnected without notice WARNING Danger to life from residual el...

Страница 10: ...work at magnetic fields of more than 8 T u Prevent exposure of more than 200 mT for more than 8 h day u Keep disks credit cards and electronic devices away from the identified area u Do not use ferro...

Страница 11: ...that all the warning labels are maintained in their proper place any time that the device is used Danger Spot Warning indicating a danger spot in work rooms The warning label may be ordered using Bru...

Страница 12: ...Safety 12 Z33119_2_003...

Страница 13: ...s on request 2 m 400 US PLUS R SB Nitrogen free Z107439 all AscendTM all frequencies all USplus SB LH all USplus SB ULH all US SB ULH 300 500 US SB LH 300 400 US WB LH USplus WB LH 92137 500 54 AS Mag...

Страница 14: ...View of the BCU of the front and the back 1 Rotary switch 7 Rating plate 2 LEDs 2x 8 Variable temperature VT gas IN 8mm max 6bar 3 Transfer line VT gas OUT 9 Main switch 4 Air inlet grid 10 Fuse 2 x 5...

Страница 15: ...2 4 A Power Requirement 600 VA Power Consumption 280 W Cool down time 15 min Circuit protection 2 Fuses 5 x 20 mm 10 AT Gas Supply Data Value Min gas temperature end of transfer line 40 C 0 3000 l h...

Страница 16: ...Manufacturer Type Voltage Frequency Apparent power consumption maximum Year of Production PN Part Number SN Serial Number V Variant ECL Engineering Change Level Refrigerant Figure 3 4 BCU I Type 1 220...

Страница 17: ...The undertakings agreed in the supply contract as well as the manufacturer s Terms and Conditions and Terms of Delivery and the legal regulations applicable at the time of the conclusion of the contra...

Страница 18: ...Introduction 18 Z33119_2_003...

Страница 19: ...anty 4 1 Symbols on the Packaging The following symbols are affixed to the packaging material Always observe the symbols during transport and handling Top The arrow tips on the sign mark the top of th...

Страница 20: ...ction Damage compensation claims can only be asserted within the applicable complaint deadlines 4 3 Packaging About Packaging The individual packages are packaged in accordance with anticipated transp...

Страница 21: ...onths regularly check the general condition of all parts and the packaging If necessary top up or replace preservatives Under certain circumstances storage instructions may be affixed to packages whic...

Страница 22: ...hen the box is positioned in the lab First open the black plastic belts Then cut the tapes along the cardboard box edges and on the top On top of the packed BCU I are the security hints and the packag...

Страница 23: ...a second person the BCU I 30kg out of the cardboard box Remove the butterfly nuts on the bottom of the BCU I and keep them for later use The BCU I can be placed according to the instructions in Prepa...

Страница 24: ...ted to the probe When the transfer line is not connected cover the connector with the white plastic cover Check each time that the O ring at the front of the transfer line connector is clean before it...

Страница 25: ...ock on the bottom of the housing u Store the packaging and the transport safety lock Use only the original packaging for transportation or shipping u Do not place any object on top of the unit NOTICE...

Страница 26: ...e BCU I outside 0 5mT 5 G and not less than 1m from the axis of the magnet For magnets 750MHz Place the BCU I outside the 5mT 50 G and not less than 2 7m from the axis of the magnet Unscrew and remove...

Страница 27: ...onal equipment A MAS box Z120576 is required with a BVT3x00 and MAS A membrane dryer 1808577 is required in case the VT gas does not meet the dew point temperature specifications General Information S...

Страница 28: ...Preparation 28 Z33119_2_003...

Страница 29: ...SampleCase Cooled into the D Sub 15 socket of the BCU I Position 6 In case the BCU I is operated with a BVT order the cable BSCU cable retrofit long Z118350 For NMR probes with a VT gas coupler as sh...

Страница 30: ...Installation 30 Z33119_2_003...

Страница 31: ...this manual u Before starting work ensure that All covers and safety devices are installed and functioning properly No persons are in the danger zone u Never disable or bypass safety devices during o...

Страница 32: ...is connected with BSVT Remote LED Information OFF Manual Operation Mode or NO power Green flashing Connecting to BSVT Green ON Connected to BSVT Red ON ERROR no connection BCU I is connected with BVT...

Страница 33: ...maximum mode the VT gas is cooled to the lowest specified temperature The BCU I is in a manual mode and cannot be controlled with the BVT or BSVT In manual mode the BCU I can be operated without a com...

Страница 34: ...t room temperature has to be fed to the NMR probe or the VT gas tubing of the BCU I has to be dried and purged In this setting the compressor is not running Purge with dry clean air or nitrogen gas at...

Страница 35: ...Loose components and tools lying around or on top of each other may lead to accidents u When reinstalling previously removed components make sure that the components are mounted properly all fixing el...

Страница 36: ...t of mechanical parts u Shut off the device before accessing it Environmental protection Observe the following environmental protection instructions during maintenance work In respect to all lubricati...

Страница 37: ...ed Parts The following spare parts can be ordered for the BCU I Fan set 220 240V 50Hz 60Hz Z129903 Fan set 100V 50Hz or 100 115V 60Hz Z129904 Dust filter set BCU I Z150447 IEC Standard Fuse 5 x 20mm 1...

Страница 38: ...mum lifetime of the BCU I the dust filter has to be cleaned or replaced every 6 months Procedure to clean or replace the dust filter 1 Unplug the power cable from the power socket of the BCU I 2 Loose...

Страница 39: ...Troubleshooting Z33119_2_003 39 9 Troubleshooting Please refer to the table on the following page...

Страница 40: ...ugh heater power Too high cooling power In the Configuration tab in edte adjust the maximum heater power to a higher value Remote Reduce cooling power in edte Manual mode Reduce cooling power by turni...

Страница 41: ...ry switch is on remote and sample heater is on BVT Off Red No switch signal 5V from the BVT Plug in the communication cable from the BVT into the D Sub 15 socket of the BCU Exchange the communication...

Страница 42: ...Troubleshooting 42 Z33119_1_003...

Страница 43: ...shipping address and also in most cases a Return Merchandise Authorization number RMA number that allows references to the repair case Always refer to this RMA number in case of questions 3 Send the d...

Страница 44: ...Replacement of Parts 44 Z33119_2_003...

Страница 45: ...onmental protection regulations 11 2 Disposal Europe Environmental information for laboratory and industrial customers within the EU European Union This laboratory product is developed and marketed fo...

Страница 46: ...12 19 EU WEEE 2 Bruker BioSpin offers to take back the equipment only for deliveries after 23 03 2006 after termination of use at the customer site upon request by the customer This request must be af...

Страница 47: ...in AG BRUKER Instruments Inc Industriestrasse 26 44 Manning Road CH 8117 F llanden Billerica MA 01821 Switzerland U S A phone 41 44 825 91 11 phone 1 978 667 9580 fax 1 978 667 0985 email info bbio ch...

Страница 48: ...Contact 48 Z33119_2_003...

Страница 49: ...Z33119_2_003 49...

Страница 50: ...Bruker Corporation info bruker com www bruker com Order No Z33119...

Отзывы: