background image

5

 

 

STEP 1

   x 8 

Sa

A

A

A

Q

R

Sa

Sa

Attach 1 leg post (A) to the post base (Q) and base plate (R) 

with 2 bolts (Sa). 

Note: The side with sunk hole on the base 

plate should be towards outside and keep the base plate 

and bolts level. Securely tighten all bolts.  

Repeat procedure for the other remaining three leg posts. 

  

 

 

STEP 2

   x 16 

Se

Attach 1

 side panel (B) to the leg posts (A) with 8 bolts (Se), 

8 large locker washers (Ss) and 8 large metal washers (Si) . 

A

A

B

Se

Ss

Si

B

   x 16 

Si

   x 16 

Ss

Do not tighten completely. 

Repeat procedure for the other pair of leg posts. 

Note: The Broyhill Logo located on one of the 

leg post should be positioned on the front 

left post as you face the swing.

 

Содержание 810494276

Страница 1: ...SEMBLY INSTRUCTION ITEM SC K 454PGS1 SKU 810494276 Need help We are here for you Please contact 1 800 457 4652 or contact us at www numarkcustomerservice com for assistance Broyhill LLC P O Box 236 Su...

Страница 2: ...d that you have all the parts and fittings Retain the assembly instructions for future reference The manufacturer will not accept responsibility for unauthorized repairs or modifications to this produ...

Страница 3: ...upport Bar x 1 Left Arm x 1 Right Arm x 2 Rear and Front Connector Bar x 4 Long Hanging Bar x 2 Short Hanging Bar x 2 Canopy Side Bar x 1 Cushion Left Right x 2 Outside Canopy Crossbar Short Long A B...

Страница 4: ...L Bolt x 2 Nut x 42 Large Metal Washer x 8 1 spare M8 x 45L Bolt x 14 x 1 Hex Wrench x 1 Open Hex Wrench x 1 Allen Wrench Small Metal Washer x 2 M8 x 77L Bolt x 16 Lawn Stake x 14 Small Locker Washer...

Страница 5: ...ghten all bolts Repeat procedure for the other remaining three leg posts STEP 2 x 16 Se Attach 1 side panel B to the leg posts A with 8 bolts Se 8 large locker washers Ss and 8 large metal washers Si...

Страница 6: ...hten completely Repeat procedure for the other pair of top crossbars x 8 Sh x 8 Sr C C C D D D Sb Sb Sr Sr Sh Sh STEP 4 x 16 Sd Attach 2 pairs of assembled top crossbars C D to leg posts A with 16 bol...

Страница 7: ...r washers Ss and 8 large metal washers Si Do not tighten completely C C D D E E Si Ss Sf x 8 Sf x 8 Si x 8 Ss STEP 6 C C C C D D F1 F1 F1 F1 F1 Insert 3 inside canopy crossbars F1 into top crossbars C...

Страница 8: ...b Sr Sh x 4 Sb x 4 Sh x 4 Sr F2 F2 STEP 8 x 2 Sc x 2 Sh x 2 Sr inside Sh Sr Sc G B B B Attach 1 leg support bar G to side panels B with 2 bolts Sc 2 small locker washers Sr and 2 small metal washers S...

Страница 9: ...e brackets on the arms Make sure they are securely seated FRONT STEP 10 x 2 Sg Sk x 2 Si FRONT I K H H K Sj Si Sk Sg x 2 Sj x 2 Attach 1 seat and back K to left and right arms H I with 2 bolts Sg 2 pl...

Страница 10: ...L L L H Attach 4 hanging bars L and 2 hanging bars M to the arms I H and top crossbars E with hooks Sl Note Hanging bars with top sticker should be on top E Sl Sl K K H I STEP 12 Sm A Q R x 16 Sm Att...

Страница 11: ...e canopy should be placed under the brackets O O N STEP 14 N Insert 2 canopy side bars O into canopy N and attach cushion Swing is ready for use 11 Note The Broyhill Logo located on one of the leg pos...

Страница 12: ...from the pin bolt on the seat back K M K K G G L K K G G STEP 16 The support bar on the back of seat and back K should be inserted into the U shaped brackets at the same time by 2 people and firmly pr...

Отзывы: