Broyce Control P9625 Скачать руководство пользователя страница 2

 

  

 

 

 
 

 
 
 
 
 

 

 

 

 
 

 

Broyce Control Ltd., Pool Street, Wolverhampton, West Midlands WV2 4HN. England 

Tel: +44 (0) 1902 773746 Fax: +44 (0) 1902 420639 Email: [email protected] Web: www.broycecontrol.com

 

The information provided in this literature is believed to be accurate (subject to change without prior notice); however, use of such information shall be entirely at the user’s own risk

P9625-2-A

  2

2

2

2    

XXXXXX 

P

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

 
 

 
 
 
 

 

SETTING & OPERATION 

 
Setting of the P9625 is carried out using the 4 potentiometers located behind the 
transparent cover.  
 

1. Delay 

   
   

The adjustment for 

“Delay”

 defines the delay period 

between exceeding a trip threshold on any of the phases 
and the relay energising.  
    The delay can be set from 50mS to 1.0s. 
 

 

 

 

 

2. Trip threshold 
 

 

Individual adjustments for the trip threshold allow 

the user to set each phase independently of each other. 
When the threshold is exceeded on any phase due to 
an Overcurrent condition, the corresponding red LED 
above the adjustment illuminates indicating activity. 
When tripping finally occurs, the red “Trip”

“Trip”

“Trip”

“Trip” LED will 

then flash.

 

 

 
In response to an Overcurrent condition (on any phase): 
 

Status 

Phase LED* 

Trip 

Normal 

 

 

Phase triggered 

 

 

Tripped  

 

 

 
In response to Test and Reset button operation: 
 

Button press 

Phase LED* 

Trip 

 

 

 

 

 

 

 
* Can be L1(R), L2 (S) or L3(T)  
 
Key: 
 

LED off    

 

 

LED on  

 

 

LED flashing   

 
 
 
 
 
 
 

 

 

 

                             

 

 

INSTALLATION 

 
 
 
 
 

 

BEFORE INSTALLATION, ISOLATE THE SUPPLY. THIS PRODUCT IS 
DESIGNED TO CONNECT TO SEVERAL TYPES OF CIRCUITS. 
ENSURE ALL ARE ISOLATED

 

 

Remove the P9625 from the packaging. 

 

Lift the raised part of the side clip in order to remove from the housing. Carry 
this out on each side.  

 

Insert the P9625 into the panel cut-out and fit the side clips back on to the 
housing.

 

 

Slide the clips towards the front of the unit until they come in to contact with 
the reverse of the panel. The unit is now secured in place.

 

 

Connect wires to the rear terminals as required.

 

 

The P9625 is now ready for powering and setting. 

 

 

The front window of the P9625 is supplied with a clear protective film which can be 

removed as and when necessary. 

 

 

 

NORMAL OPERATION 

 

 

Apply power to the unit and the green 

“Power supply”

 LED will illuminate. 

 

 
 
 
 
 
 

 

 

 

TEST MODE 

 
 

 

Press and hold the

 

 button and the relay will energise after the delay 

period.

 

All red LED’s will illuminate.

 

 

Release the 

 button, the relay will remain energised and all red LED’s lit.

 

 
 
 

 

Press the 

 button to de-energise the relay. All red LED’s will extinguish.  

 

Testing should be carried out on a regular basis to check the integrity of the 

P9625. 
 

DO NOT use this product to provide a means of isolating circuits in 
order to work on when placed in the “TEST”

“TEST”

“TEST”

“TEST” mode. This should only be 

done by means of operating isolators, circuit breakers or other 
methods of removing power in this application. 

 

 

 

Installation work must be carried

out by qualified personnel.

 

 

 

 

 

 

 

 

Отзывы: