![BROWN SP-2B Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/brown/sp-2b/sp-2b_owners-manual_2820247003.webp)
Unpacking Procedure:
1.Remove Top Cover
2.Remove packaging from around tubes make sure tubes are properly seated
during installation, they should have a faint glow during power on.
3. Remove protective cushioning from around signal tubes.
Power Up Procedure:
1. Connect all components to appropriate inputs.
2. Connect to Power Amplifier(s) and AC Cord.
3. Make sure mute switch is in the “Operate” position.
4. power up sources first, then preamp and lastly the power amplifiers.
5. There should be a delay of about 30 seconds before outputs are engaged, the
mute LED will flash for 30 seconds, you will hear a slight clicking noise, and
the LED will remain on.
6. when powering down, engage the mute switch back to the “mute”
position. Switch power amplifiers down first, Then the preamp, and lastly the
sources.
Fuse Replacement:
Replace fuse with 750mA (250V) Slow-Blo Time Delay. Size is 5mm X 20mm
cartridge.
Caution: Allow for adequate ventilation, as the preamp tubes produce quite a
bit of heat.
3