3. Specification
3.1 Overview
Fig. 1: Overview
1
2
6
8
2
3
9
10
9
1
4
3 4
5
7
1 Union nut
6 Neutralisation pipes
2 Sliding ring
7 Granulate
3 Sealing wedge
8 Outlet connection
4 Plug filter
9 Bracket
5 Inlet connection
10 Filling height label
3.2 Technical data
Fuel
Gas
Conncection dimensions (inlet/outlet)
DN 40
Inlet height
mm
min.100
Height of the neutralisation equipment
mm
138
Length of the neutralisation equipment
mm
342
Diameter of the neutralisation tube
mm
120
Neutralising
Mg (OH)
2
/CaCO
3
max. temperature
°C
60
Condensate inlet
pH
≥ 3,0
Maintenance interval
annually
Specification
7311617-02 08.13
Neutralisation unit NEOP 70
15
GB
Содержание NEOP 70
Страница 12: ...5 4 Wartungsnachweis Wartung 12 Neutralisationsanlage NEOP 70 7311617 01 08 13 DE ...
Страница 20: ...5 4 Proof of Service Maintenance 20 Neutralisation unit NEOP 70 7311617 02 08 13 GB ...
Страница 28: ...5 4 Carnet de maintenance Maintenance 28 Installation de neutralisation NEOP 70 7311617 02 08 13 FR ...
Страница 36: ...5 4 Libretto di manutenzione Manutenzione 36 Impianto di neutralizzazione NEOP 70 7311617 02 08 13 IT ...
Страница 44: ...5 4 Registro de mantenimiento Mantenimiento 44 Instalación de neutralización NEOP 70 7311617 02 08 13 ES ...
Страница 52: ...5 4 Onderhoudsboekje Onderhoud 52 Neutralisatiesysteem NEOP 70 7311617 02 08 13 NL ...
Страница 60: ...5 4 Protokół z przeprowadzonej konserwacji Konserwacja 60 Neutralizator skroplin NEOP 70 7311617 02 08 13 PL ...
Страница 65: ...Raum für Notizen Space for notes Notices Appun ti Espacio para anotaciones Nota s Notatki 08 13 65 ...
Страница 66: ...Raum für Notizen Space for notes Notices Appunti Es pacio para anotaciones Nota s Notatki 66 08 13 ...
Страница 67: ...Raum für Notizen Space for notes Notices Appun ti Espacio para anotaciones Nota s Notatki 08 13 67 ...