9
3. Installation
LK3-B448E MARKII/BA-16
3-4. Installing the control box
1. Remove the 12 screws
q
, and then open the covers (panel mounting assembly
w
and main P.C. board mounting
plate
e
).
NOTE:
When opening the cover, hold it securely so that it does not fall down.
2. Install the control box with the four accessory bolts
r
, cushions
t
, cushion collars
y
, rubber collars
u
, flat
washers
i
and nuts
o
as shown in the illustration above. At this time, leave a gap of approximately 3 mm between
the work table and the top of the box.
* Use two nuts
o
at each installation location, and make sure that both nuts are tightened.
3. Close the covers (panel mounting assembly
w
and main P.C. board mounting plate
e
), and tighten them with the
screws
q
.
* The main P.C. board mounting plate
e
will be opened again during “3-13. Connecting the cords”, so provisionally
tighten it with the screw
q
.
4. Install the power switch
!0
with the two screws
!1
.
5. Secure the power switch cord with the three staples
!2
.
6. Pass the motor cord through the cord hole
!3
.
Cushions
Cushion collars
Rubber collars
Flat washers
Nuts
3 mm
Table