13/15
brookvent.co.uk
13.
TABLE OF INSPECTIONS
Mandatory
inspections
Additional
inspection*
Inspection 1.
Inspection 2.
Inspection 3.
Inspection
4.
Inspection
5.
Inspection
6.
Inspection
7.
Inspection
8.
Inspection
9.
Inspection
10.
3 months
from
commissionin
g
6 months
from
commissionin
g
12 months
from
commissionin
g
1
Fan
contamination:
2
Dust
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
3
Construction dust
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
4
Other:
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
5
Rotor
6
Is there any
resistance at
rotation attempt
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
7
Does the rotor jam
against the body
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
8
Cleaning
performed
9
with compressed
air
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
10
Cleaning the blades
with a brush
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
11
Remarks
12
The fan is
operational
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
yes/no
13
Inspection
performed by:
14
Date
15
Stamp/signature
Содержание BTP EC 100
Страница 1: ...BTP EC Duct fan brookvent co uk Installation maintenance user manual...
Страница 14: ...14 15 14 NOTES...