Additional Maintenance Checks
It is recommended that the following checks are also made when completing annual maintenance of
the HRV unit:
•
Condensate Drain: Ensure the condensation drain is firmly secured and is clear of any debris,
remove/ clean if necessary.
•
Fixings: Ensure that all of the unit fixings and the mounting fixings have not become loose
over time and are kept sufficiently tight.
8.0
Commissioning
Commissioning is carried out to ensure that the required air flows are achieved throughout the
property. The volume airflow at each point should be measured using a suitably calibrated Airflow
Meter (anemometer), this is should be fitted with an adapter/ hood to ensure all air is captured and
measured by the device.
For the required airflow rates refer to the design specification for the property and or refer to
Building Regulations (Part F)
If further guidance is required on the commissioning process please contact BROOKVENT directly