Brooks Glass Tube Full-View 1110 Скачать руководство пользователя страница 19

2-1

Installation and Operation Manual

X-VA-1110-1140-eng
Part Number: 541B040AHG
March, 2008

Brooks

®

 1110 and 1140 Series

Section 2 Installation

2-1 General

This section contains the procedures for the receipt and installation of the
instrument. Do not attempt to start the system until the instrument has
been permanently installed. It is extremely important that the start-up
procedures be followed in the exact sequence presented.

2-2 Receipt of Equipment

When the instrument is received, the outside packing case should be
checked for damage incurred during shipment. If the packing case is
damaged, the local carrier should be notified at once regarding his liability.
A report should be submitted to your nearest Product Service Department.

Brooks Instrument

407 W. Vine Street
P.O. Box 903
Hatfield, PA 19440 USA
Toll Free (888) 554-FLOW (3569)
Tel (215) 362-3700
Fax (215) 362-3745
E-mail: [email protected]
www.BrooksInstrument.com

Brooks Instrument

Brooks Instrument

Neonstraat 3

1-4-4 Kitasuna Koto-Ku

6718 WX Ede, Netherlands

Tokyo, 136-0073 Japan

P.O. Box 428

Tel  011-81-3-5633-7100

6710 BK Ede, Netherlands

Fax 011-81-3-5633-7101

Tel 31-318-549-300

Email:  [email protected]

Fax 31-318-549-309
E-mail: [email protected]

Remove the envelope containing the packing list. Carefully remove the
instrument from the packing case. Make sure spare parts are not
discarded with the packing materials. Inspect for damaged or missing
parts.

2-3 Recommended Storage Practice

If intermediate or long-term storage of equipment is required, it is
recommended that the equipment be stored in accordance with the
following:

a. Within the original shipping container.
b. Stored in a sheltered area, preferably a warm, dry, heated

warehouse.

c. Ambient temperature of 70° F (21° C) nominal, 109° F (43° C)

maximum,
45° F (7° C) minimum.

d. Relative humidity 45% nominal, 60% maximum, 25% minimum.

Upon removal from storage a visual inspection should be conducted
to verify the condition of equipment is "as received".

Содержание Glass Tube Full-View 1110

Страница 1: ...ion Manual X VA 1110 1140 eng Part Number 541B040AHG March 2008 Brooks 1110 and 1140 Series 5 Model 1140 Full View Flowmeter Flange Connections Glass Tube Full View Flowmeters Model 1110 Full View Flo...

Страница 2: ...marked on and supplied with the product Inform and educate your personnel in the proper installation operation and maintenance of the product Install your equipment as specified in the installation in...

Страница 3: ...ch and chemicals to medical devices analytical instrumentation semiconductor manufacturing and more The Brooks product you have just received is of the highest quality available offering superior perf...

Страница 4: ...Installation and Operation Manual X VA 1110 1140 eng Part Number 541B040AHG March 2008 Brooks 1110 and 1140 Series THIS PAGE WAS INTENTIONALLY LEFT BLANK...

Страница 5: ...lers 1 7 Section 2 Installation 2 1 General 2 1 2 2 Receipt of Equipment 2 1 2 3 Recommended Storage Practice 2 1 2 4 Return Shipment 2 2 2 5 Transit Precautions 2 2 2 6 Removal form Storage 2 2 2 7 I...

Страница 6: ...odel 1110 Exploded Parts Drawing Continued 5 3 5 1c Model 1110 Exploded Parts Drawing Continued 5 4 Tables Table Page Number Number 1 1 Pressure Ratings and PED Category 1 3 1 2 Connections 1 5 1 3 Ca...

Страница 7: ...ctions Rugged dowel pin side plate construction Precision bore plain or ribbed borosilicate glass metering tubes Reliable externally adjustable packing glands for ease of maintenance Flanged or NPT co...

Страница 8: ...um flow Ambient Temperature Limits 33 F to 125 F 1 C to 52 C Operating Fluid Temperature Limits Maximum 250 F 121 C for metallic end fittings Reduced ratings on meters with nonmetallic end fittings Re...

Страница 9: ...3 Metal 100 100 100 NOTES 1 Maximum temperature rating for nonmetal end fittings is 150 F 66 C for all materials except PVC which is 140 F 2 Flanged unit pressure ratings are limited to ANSI flange ra...

Страница 10: ...to comply could result in serious personal injury or property damage WARNING GLASS TUBE EXPLOSION HAZARD Packing Material Standard Teflon Neoprene Viton fluoroelastomers O rings Standard Teflon Optio...

Страница 11: ...on 1 Introduction Model 1110 Model 1114 Model 1140 Model 1144 Meter Inlet Outlet Inlet Outlet Inlet Outlet Inlet Outlet Size Horizontal Vertical Horizontal Vertical NPT NPT Flange Flange 2 to 6 1 4 1...

Страница 12: ...m scale length Flange dimensions apply to 150 300 raised face or flat face flanges All Dimension in Millimeters 1110 1140 1114 1144 Nominal Scale Length MM Nominal Scale Length MM Nominal Scale Length...

Страница 13: ...DS FCA Figure 1 3 Float Types Spherical Lowest meter capacityandnoviscousfluids with medium capacity Type RV rib guided Highest immunity to viscous fluids with medium meter capacity Most stable Type...

Страница 14: ...s 605 24 2 slpm 7 R 7M 25 1 Stn Steel 1 286 42 7 slpm Monel 1 360 44 8 slpm MAXIMUM FLOW RATE METER WATER AIR 14 7 PSIA SIZE TUBE FLOAT CC MIN AND 70 F 21 C GLASS 0 524 47 1 SCC MIN SAPPHIRE 1 02 73 3...

Страница 15: ...5 380 9 8 0 0 R 9M 25 3 9 RV 87 3 92 14 84 14 0 17 0 16 25 460 2 16 0 30 9 RS 87 5 12 19 38 17 0 3 5 21 20 600 4 20 0 30 9 LJ 160 9 65 36 53 43 0 1 0 44 18 1 251 2 49 0 30 10 RV 64 4 54 17 18 8 0 14 0...

Страница 16: ...8 2 4 20 35 576 3 13 0 0 R 9M 127 3 9 RV 87 5 55 21 01 18 1 17 0 23 30 659 9 21 0 30 9 RS 87 6 75 25 55 21 7 3 5 28 75 814 2 25 0 30 9 LJ 160 17 20 65 10 79 0 1 0 83 40 2 361 9 90 0 30 10 RV 64 4 28...

Страница 17: ...0 14 76 23 0 16 3 16 40 464 4 26 0 0 9 9M 25 2 9 GS 75 5 22 19 76 34 0 2 1 21 60 611 7 38 0 0 9 LG 60 7 02 26 57 52 0 1 0 9 LG 88 8 91 33 72 81 0 1 0 9 LG 124 11 00 41 64 121 0 1 0 10 GV 54 5 60 21 20...

Страница 18: ...1 12 Installation and Operation Manual X VA 1110 1140 eng Part Number 541B040AHG March 2008 Brooks 1110 and 1140 Series Section 1 Introduction THIS PAGE WAS INTENTIONALLY LEFT BLANK...

Страница 19: ...rsonProcess com www BrooksInstrument com Brooks Instrument Brooks Instrument Neonstraat 3 1 4 4 Kitasuna Koto Ku 6718 WX Ede Netherlands Tokyo 136 0073 Japan P O Box 428 Tel 011 81 3 5633 7100 6710 BK...

Страница 20: ...s Fax 011 81 3 5633 7101 Tel 31 318 549 300 Email BrooksAs EmersonProcess com Fax 31 318 549 309 E mail BrooksEu EmersonProcess com All flow instruments returned to Brooks requires completion of Form...

Страница 21: ...roper operation of the Full View flowmeter it must be mounted within 6 degrees of true vertical with the inlet connection at the bottom of the meter and the outlet at the top The use of a level is rec...

Страница 22: ...2 4 Installation and Operation Manual X VA 1110 1140 eng Part Number 541B040AHG March 2008 Brooks 1110 and 1140 Series Section 2 Installation THIS PAGE WAS INTENTIONALLY LEFT BLANK...

Страница 23: ...the zero line on the scale the flowmeter is ready for operation If the zero lines are not aligned loosen the screws securing the scale and move it until the marks are in alignment Then tighten the sc...

Страница 24: ...LOWMETER To initiate flow through a flowmeter using bypass piping refer to Figure 3 1 1 Close flowmeter isolation valves A and B 2 Fully open bypass valve C and slightly open control valve D 3 Initiat...

Страница 25: ...anual X VA 1110 1140 eng Part Number 541B040AHG March 2008 Brooks 1110 and 1140 Series Section 4 Maintenance and Cleaning 4 1 General This section provides the assembly and disassembly procedures for...

Страница 26: ...es from the end fittings 6 Remove the inlet packing narrow end both gland rings polycarbonate sleeve Size 7 1 2 and larger and gland followers from the tube 7 Remove the float from the tube 8 Remove t...

Страница 27: ...mount of silicone lubricant may be used 5 Install the end fittings onto the tube and packing assembly Insure that the outlet large end of the tube fits flush against the tube seat gasket in the outlet...

Страница 28: ...4 4 Installation and Operation Manual X VA 1110 1140 eng Part Number 541B040AHG March 2008 Brooks 1110 and 1140 Series Section 4 Maintenance and Cleaning THIS PAGE WAS INTENTIONALLY LEFT BLANK...

Страница 29: ...X X X X X 7 Gland Followers X X X X X X 8 Float X X X 9 Inlet Float Stop Plug X X X 10 Inlet Spring Stop Valve stop X X X 11 Outlet Float stop X X X 12 Outlet Spring Stop Valve stop X X X 13 Inlet En...

Страница 30: ...5 2 Installation and Operation Manual X VA 1110 1140 eng Part Number 541B040AHG March 2008 Brooks 1110 and 1140 Series Section 5 Accessories Figure 5 1a Model 1110 Exploded Parts Drawing...

Страница 31: ...5 3 Installation and Operation Manual X VA 1110 1140 eng Part Number 541B040AHG March 2008 Brooks 1110 and 1140 Series Section 5 Accessories Figure 5 1b Model 1110 Exploded Parts Drawing Continued...

Страница 32: ...5 4 Installation and Operation Manual X VA 1110 1140 eng Part Number 541B040AHG March 2008 Brooks 1110 and 1140 Series Section 5 Accessories Figure 5 1c Model 1110 Exploded Parts Drawing Continued...

Страница 33: ...Installation and Operation Manual X VA 1110 1140 eng Part Number 541B040AHG March 2008 Brooks 1110 and 1140 Series THIS PAGE WAS INTENTIONALLY LEFT BLANK...

Страница 34: ...the world ensuring quick delivery from local stock timely repairs and locally based sales and service facilities Our dedicated flow experts provide consultation and support assuring successful applic...

Отзывы: