Operation & Installation Manual RFS1 V2
MA365 Rev 3
26 of 46
circuit and it must be on the last Smoke/Heat Alarm. If this is set incorrectly, the fault
LED will be indicated on the panel.
Note: It is essential that DIP switch 3 is set to “ON” position if SUB1012 is situated
in the last position on the zone. Outgoing termination point is to be left empty.
4.4
Input / Output Module EIB209IO
Figure 12 Generic input / output field module EIB209IO
The input/output module is a zone module which interfaces the control panel to
external devices. The module is fitted (clip in) in x-series rectangular base.
The input is a clean contact input and non-supervised, it can be used to interface a
manual call point or a sprinkler flow switch to RFS1 V2.
The alarm output can be either a changeover relay contact or 12V
DC
(or 0V
DC
)
switched output via the “COM” terminal depending on the position of jumper link JP2,
the output is limited to 1Amp, non-supervised and may be utilised to drive strobes or
vibration pads.
The module provides terminals for remote indication RIL, this indication can be either
for remote alarm or for remote fault indication or both.
4.4.1
Jumper Link Setting
Table 7 EIB209IO card jumper settings
Jumper
Function
Description
Jumper Position
JP1
Priority
Selection
Not used in RFS1 V2
JP2
Alarm Relay
Voltage free contact
Jumper not fitted
Com=0V (switches 0V to
NO terminal)
Jumper across pin 1 & 2
Com=12V
DC
(switches
12V
DC
to NO term inal)
J um per across pin 2 & 3
JP3
Alarm Relay
& RIL Trigger
Standalone
, activated of
Sm oke or Heat Alarm
J um per across pin 1 & 2
or not fitted
Common
, activated of
Com m on Interconnect
Bus
J um per across pin 2 & 3
JP1: N/A
JP3: relay operation
JP2: Relay Common Power
selection (0V/12V/isolated)
Содержание EIB650iWX
Страница 1: ...Operation Installation Manual RFS1 V2 Rev 3 Residential Fire System RFS1 V2 MA365 July 2019...
Страница 2: ...Operation Installation Manual RFS1 V2 MA365 Rev 3 1 of 46...
Страница 41: ...Operation Installation Manual RFS1 V2 MA365 Rev 3 40 of 46 INSTALLERS STATEMENT Page 2 of 2 Additional Comments...