Quick Installation Guide
Doc. no.: 9.17.074D Date: 26-11-2018
Starting up the IQ+FLOW® in 10 steps
Страница 1: ...Quick Installation Guide Doc no 9 17 074D Date 26 11 2018 Starting up theIQ FLOW in10 steps ...
Страница 2: ...ww bronkhorst com downloads or can be sent by email on request Starting up 1 Check functional properties Before installing the instrument check if the properties stated on the serial number label match your requirements Instrument type o gas flow red label or o pressure yellow label Flow rate Fluid to be measured Upstream and downstream pressures Input output signals Temperature IQ FLOW gas flow i...
Страница 3: ...tubing with a straight and clean cut without burrs to ensure leak tightness Preferably deburr the tubing prior to installation A new ferrule connection must be made for each new adapter to ensure leak tightness and minimum dead volume due to variances in the adapter dimensions d Mounting downported instruments For downported instruments make sure that the seals are present at the bottom that the s...
Страница 4: ...rogen or Argon is absolutely necessary before use After use with corrosive reactive or hazardous media e g toxic or flammable purging is also necessary before the system is exposed to air Warm up time For accurate measurement it is recommended to warm up the instrument for at least 30 minutes This can be done with or without media flow e g while purging 10 Zeroing only flow meters controllers The ...