background image

9.17.100 B

2

SCOPE OF THIS GUIDE

This Quick Installation Guide covers the 

EL-PRESS

 series Digital Pressure Meters and Controllers. These instruments are equipped

with a diaphragm type piezoelectric resistive pressure sensor and offer high accuracy, stability and reliability. These instruments
are designed for laboratory and clean processing conditions and are suited to measure and control pressure ranges between 0…
100 mbar and 0…400 bar. 

EL-PRESS

 instruments are equipped with a digital printed circuit board, featuring diagnostics and

counter functions, digital communication (RS232) and a PID controller. Thanks to the 'multibus' concept, instruments can be
equipped with an onboard fieldbus interface as an option.

This Quick Installation Guide will help you start up your 

EL-PRESS

 in 9 steps, covering the following subjects:

1.

  Checking functional properties

2.

  Checking pressure

3. 

 Checking piping

4.  

Mounting/installing instrument

5.

  Leak check

6

.   Electrical connection

7.

   Analog/digital operation

8. 

  Multifunctional switch operation

9. 

  Purging

Other applicable documents:

- Manual 

EL-PRESS 

series (document no. 9.17.101)

Interfaces

Manual

Hook-up diagram

- Analog/RS232 interface

9.17.027

9.16.119

- DeviceNet™ interface

9.17.026

9.16.122

- EtherCAT® interface

9.17.063

9.16.124

- FLOW-BUS interface

9.17.024

9.16.120

- Modbus interface

9.17.035

9.16.123

- PROFIBUS DP interface

9.17.025

9.16.121

- PROFINET interface

9.17.095

9.16.148

- Custom bus & I/O configurations

n/a

9.16.118

   

The instrument manual and hook-up diagrams can be downloaded from the 

EL-PRESS

 product pages on the

Bronkhorst website: 

www.bronkhorst.com/products/pressure 

Other documents can be found on our general download page (

www.bronkhorst.com/downloads

)

Starting up

1

Check functional properties

Before installing the instrument, check if the properties stated on the
instrument label match your requirements:

Flow and/or pressure rate

Media to be used in the instrument

Upstream and downstream pressure(s)

Operating temperature

Valve type (N.C. - Normally Closed / N.O. - Normally Opened)

Input and output signal

2

a. Check tested pressure

Before installation, make sure that the test pressure is in accordance with
the safety factor of your application.
The test pressure is stated on the instrument with a red label. If this label is
missing, or if the test pressure is insufficient, the instrument must 

not 

be

mounted in the process line and should be returned to the factory.

b. Check operating conditions

EL-PRESS

 instruments are suitable for use at temperatures between -10 and +70 °C. The instrument housing has

ingress protection rating IP40, implying that the equipment is suited for general purpose indoor (dry) applications,
like laboratories and machine enclosures.

© 2018 Bronkhorst High-Tech B.V.

3

3

Check if system piping is clean

For reliable operation, always make sure the fluid stream is clean.
Use filters to ensure a moisture, oil and particle free gas stream (recommended pore-size: 5 µm).
If back flow can occur, the use of a downstream filter and a check valve is also recommended. Select a suitable
filter size, to avoid a too high pressure drop.

4

Mounting/installing

P-500/600/700 instruments

: install the instrument in the line in accordance with the flow arrow on the

instrument body.

P-800 instruments

: install the fluidic connections in accordance with the inscriptions on the instrument body

(IN, OUT, RELIEF)

Forward pressure control (P-600)

Back pressure control (P-700)

Process Pressure Controller (P-800)

For high flow rates, installing the pressure meter in a separate branch is
strongly recommended (using a T-piece fitting).

Tighten the fluidic connections according to the instructions of the supplier of the fittings. The use of Swagelok
RS-type stainless steel adapters and Bronkhorst® elastomer O-rings is recommended.

Avoid installation in close proximity of mechanic vibration and/or heat sources.

5

Leak check

Check the system for leaks before applying (fluid) pressure, especially if toxic, explosive or other dangerous fluids
are used.

6

Electrical connection

Electrical connections must be made with standard cables or according to the applicable hook-up diagram (see
page 2). 

EL-PRESS

 instruments are powered with +15…24 Vdc.

A. Analog connection 

B. Digital RS232 connection powered by  plug in

power supply

C. Fieldbus (e.g. DeviceNet™)

Never

 power the instrument simultaneously from 

two different power sources

 (e.g. fieldbus connection and

Plug-in Power Supply). Doing so will damage the printed circuit board irreparably.

Отзывы: