3
MODEL: 911050 / 2000 SERIES
BROIL KING KEG
®
ASSEMBLY INSTRUCTIONS
M5 x 38
(top screws)
M5 x 55
(bottom screws)
bottle opener
tabs
Handle
gasket
FRONT HANDLE
SIDE HANDLE
M5 x 55
Proper assembly of your new BROIL KING KEG
®
will only require a Phillips head screw driver, a ½ inch or 13mm wrench and a buddy (for lifting). Follow
the steps outlined below and it should take approximately 20 minutes to complete. Refer to illustration on page 2 for part(s) identifi cation and placement
positions.
NOTE: Hand tighten all screws during placement and securely tighten with screwdriver when all parts of that assembly are in place.
STEP 1:
Unlock clasp and open the Keg’s lid. Remove
and unpack all contents and check against parts
inventory list.
STEP 2:
Attach front handle with Phillips head screwdriver.
M5 x 55 screws go in the bottom holes with the bottle
opener tabs. M5 x 38 screws go in the top holes. Silicone
gaskets install behind handle (two places).
STEP 3:
Attach side handles (2) using 4 (M5 x 55)
screws. Use Phillips head screwdriver. Note the
“Bottom”written on the handle and orient down.
NOTE: With all handle screws in place, securely tighten
with screwdriver.
STEP 4a:
With everything out of the grill, re-lock clasp
on the Keg’s lid.
STEP 4b:
With your buddy’s help, fl ip the grill upside
down and place back into the styrofoam, on its lid.
STEP 5:
Screw the legs into the threaded inserts in the
bottom of the grill using the leg washer and M8x20
screws, (hand tighten only).
STEP 6:
Assemble the Hoop to the legs using the Hoop
Brackets and the M6x15 screws as shown. Tighten all
leg and hoop bracket screws with a screwdriver.
STEP 7:
With your buddy’s help, fl ip the grill right side
up on to the fl oor.
M8x20
M6x15