
B102250-1-0714
Page 11
24 3/4
”
ABOVE GRADE
GAS SUPPLY LINE
1. Dig a posthole approximately 12" in diameter and 28 3/4" in depth at the desired grill location.
Note: "Normal Installation" height is achieved when the top of the 48" post is 24 3/4" above ground. This
height provides a cooking surface height of approximately 34" above ground when grids are placed in the
high level.
2. Carefully lower the in-ground post into the hole using the following guidelines:
•
The upper rectangular cut-out is located near the top of the post and should be above ground
after installation.
•
The rectangular cut-out must face in the same direction as the front of the grill.
•
Hole depth and post measurements should be checked to ensure desired height.
Note: Make any adjustments at this time.
3. Prepare concrete or a standard pre-mix according to the manufacturer's package directions. Position
the 48" post in the center of the hole. A level should be used when aligning the post to achieve precise
vertical alignment. Hold the post in place while pouring the concrete mixture into the hole around the post.
Keep concrete below gas line hole.
CONCRETE OR
STANDARD
PRE-MIX
SOIL GRADE
Check Local Codes for requirements
concerning buried gas lines.
PLACE POST IN GROUND
Содержание IN-GROUND POST BL48G-2
Страница 12: ...B102250 1 0714 Page 12 5 16 ATTACH UPPER BRACKET HEX HEAD SCREW SS 10 X 1 2 B101569 4...
Страница 17: ...Page 17 BL26P 2 SS26P 2 PATIO BASE PR EM IU M GR ILLS BL26P 2 SS26P 2 PATIO BASE SECTION...
Страница 18: ...B102250 1 0714 Page 18 PATIO BASE PARTS DIAGRAM...
Страница 20: ...B102250 1 0714 Page 20 5 16 ATTACH LOWER BRACKET HEX HEAD SCREW SS 10 X 1 2 B101569 8 STAINLESS SERIES ONLY...
Страница 28: ...B102250 1 0714 Page 28 GRILL MAINTENANCE HISTORY Date Maintenance Performed...
Страница 29: ...B102250 1 0714 Page 29 GRILL MAINTENANCE HISTORY Date Maintenance Performed...
Страница 30: ...B102250 1 0714 Page 30 GRILL MAINTENANCE HISTORY Date Maintenance Performed...