Brofer MDF 25 Скачать руководство пользователя страница 3

8

IT

ENG

PRECAUTIONS FOR HANDLING AND INSTALLATION

CAUTION!

• All operations of handling and installation shall be made with the blade of the fire damper in the closed position 

(our standard delivery). 

• All operations of connection power line must be performed by qualified service personnel. 

• Keep clean the connecting end from residues of cement to securely connect the rest of the duct 

• Avoid any deformation of the duct and / or obstacle inside the duct which may prevent the successful rotation of 

the blade 

• Check that there are no external obstacles (cables, pipes, etc. ..) to prevent the correct operation of the controls 

outside of the duct 

• Keep the most accessible as possible to the control side in order to ensure the necessary space usage and mainte-

nance of the damper.

MAINTENANCE

Is advisable to periodically run a check  the correct operation of the actuating and signal the damper. In particular, 

check the correct and complete opening and closing of the blade: for the operation of the controls follow the instruc-

tions listed “CONTROL OPERATION.” Also check that the warning devices at the beginning and ending are in good 

condition and working properly.

DIMENSIONAL

WALL INSTALLATION

• 1 -  Before proceeding with the installation, verify the integrity of the damper, 

the correct positioning of the blade in the closed position and the operation of 

the command.

• 2 - Provide support having an opening on the increased size of 50 mm from the 

nominal dimensions of the damper.

• 3 -  Fold in hand the four 

mounting brackets.

• 4 -  Position the damper inside 

the opening.

• 5 -  Observe 

the protru-

sions shown 

in Table 1 

so that the 

rotation axis 

of the blade 

is perfectly 

centered to 

the support.

Отзывы: