Broderson IC-20-1K Скачать руководство пользователя страница 52

 3-16 

PROPULSION SYSTEM 

 
The propulsion system is a closed-loop hydrostatic transmission.  The variable volume 
piston pump is driveline driven from the engine crank shaft.  The pump can deliver up to 
30-gpm (114 L/min) or 3000 psi (207 bar) to the wheel drive motors.  The flow from the 
wheel drive motors returns directly to the pump inlet, not the reservoir.  The built-in 
charge pump maintains approximately 220 psi (15 bar) pressure to the intake side of the 
piston pump whenever the engine is running.  Excess flow from the 8-gpm (30 L/min) 
charge pump combines with case drain flow and goes through the cooler, and returns to 
tank. 
 
When the transmission control lever in the operator compartment is pushed forward, the 
pump starts delivering oil to the wheel drive motors for forward travel.  When the 
transmission control lever is released, the pump blocks the flow and the wheel drive 
motors stop.  If this is done on level ground, the crane will stop and stand still.  If this is 
done on an incline, the crane will stop, but then creep down the incline, due to oil leaking 
through the wheel drive motors.  ALWAYS apply the parking brake when the crane is 
stopped.  When parking on a slope, also set the outriggers or place wheel chocks on the 
downhill side of the wheels. 
 
A positraction flow divider is located in the line between the pump and drive motors.  
When a wheel is lifted off the ground, is on ice, or for any reason starts to spin, it will 
momentarily take more oil than the wheel that has traction.  When this happens, a spool 
inside the positraction valve will shift and restrict the high flow to the spinning wheel, 
forcing flow to the wheel with traction.  If the unit stops moving, the engine speed will 
have to be increased to resume travel. 
 
The crane is equipped with an oil cooler that will allow it to operate properly when the 
ambient temperature is over 100°F (38°C).  An oil temperature gauge is located on the 
screen, along with the sensor. If this gauge reads above 200°F (93°C), the unit should be 
shut down and the reason for the excessive temperature located and corrected.  The fins 
on the oil cooler and engine radiator may be dirty and need cleaning. 
 
For maneuvering in tight quarters, the throttle should be set for low speed.  For traveling 
longer distances the throttle may be set to full speed.  The vehicle speed is controlled by 
the transmission lever. 
 
A manual bypass valve is built into the piston pump.  It appears like a shaft with a cross 
hole in it on the side of the pump.  If the machine cannot run under its own power, it can 
be towed for very short distances at 3 mph (5 km/h) or less by turning the bypass valve 
counterclockwise 4 turns.  It must be turned back again as far as possible to run 
normally. 
 

CAUTION:

  The crane will roll freely down inclines with the bypass valve open.  Keep the 

valve closed except when towing and the crane is secured to the tow vehicle.  An 
operator must be in the crane to operate the brakes. 
 

Содержание IC-20-1K

Страница 1: ...________________________________________________________________ _________________________________________________________________________ SOLD AND SERVICED BY ________________________________________...

Страница 2: ...product WITHOUT LIMITING THE GENERALITY OF THE FOREGOING BMC EXPRESSLY DISCLAIMS THAT THE WARRANTY MADE HEREIN EXTENDS TO A PERSON WHO RENTS OR LEASES ANY BMC PRODUCT OR WHO PURCHASES ANY BMC PRODUCT...

Страница 3: ...Reaving 2 15 Safety Devices 2 16 Outrigger Cylinder Check Valve 2 16 Boom Elevation Cylinder Holding Valve 2 16 Boom Extension Cylinder Holding Valve 2 16 Boom Extension Cylinder Holding Valve 2 16 An...

Страница 4: ...ic Fluids 3 21 Control Valve Adjustment 3 22 Boom Circuits 3 22 Hoist and Outrigger Circuits 3 22 Boom Cylinder Holding Valve 3 23 Extension Cylinder Holding Valve 3 23 Engine Maintenance 3 24 Air Cle...

Страница 5: ...conditions The recommendations for periodic inspection test and maintenance are minimum standards for safe and economical performance When ordering parts the unit serial number unit model number part...

Страница 6: ...1 2 DIMENSIONS AND ORIENTATION IC 20 1K...

Страница 7: ...1 3 TURNING DIMENSIONS...

Страница 8: ...oom elevating cylinder and hydraulic powered hoist General Length Chassis 9 feet 1 inch 2 77 m Overall 9 feet 1 inch 2 77 m Width 4 feet 1 22 m Height Deck 28 inches 711 mm Overall 5 feet 6 inches 1 6...

Страница 9: ...m Movement Rotation 90 degrees Elevation 75 degrees Telescope 9 feet 2 74 m Tailswing 2 feet 5 5 8 inches 753 mm Boom Speed Rotation 10 seconds Elevation 9 seconds Telescope 25 seconds Sheave Height W...

Страница 10: ...150 5 N m at 1600 rpm 12V 60 amp alternator Net weight 432 pounds 196 kg Hydrostatic Transmission Pump Standard Sauer Danfoss piston type 2 8 CID 45 mL per revolution direct driven from engine cranksh...

Страница 11: ...ockets are provided in deck and six 1 3 inch 34 mm diameter pipe stakes Optional Deck Mats Deck Mats Rubber mats inch 6 mm thick covering the 3 deck sections Protects delicate loads from scratching an...

Страница 12: ...rovides 1 position access to all chassis crane functions Operator s Compartment Accessories Operator Guard Tubular steel weldment with heavy expanded steel mesh top section bolts over operator s compa...

Страница 13: ...ee section high strength steel construction equipped with bearing pads for efficient support and extension Double acting hydraulic cylinders extend boom sections The primary extension cylinder and the...

Страница 14: ...e requirements Six inch O D sheave for 5 16 inch 8 mm diameter wire rope Swivel hook with safety latch Fifty pounds of weight provides positive overhaul Includes bar on top to actuate anti two block s...

Страница 15: ...or shall not engage in any practice which will divert his attention while actually operating the crane 6 This list of rules is only a supplement to all federal state and local safety rules that may ap...

Страница 16: ...crane is equipped with a Rated Capacity Limiter it must be checked before each shift and after each setup for the proper operating configuration on the display It must be inspected before each shift...

Страница 17: ...movement which can cause the load to swing Move the boom slowly whenever these systems might stop the boom 3 Do not allow anyone to put any part of his body under a load The load may lower or fall if...

Страница 18: ...the hoist drum to insure against rope pulling out of its anchor 15 Never wrap the hoist rope around a load Always use approved rigging 16 Avoid pinch points such as between a rotating turret the cab o...

Страница 19: ...r The ground surface may be energized 20 The amount of counterweight supplied with this crane should never be changed Unauthorized addition of counterweight in the field to increase lifting ability co...

Страница 20: ...ONT ON RUBBER capacity 2 When raising the boom or moving the unit with boom elevated be sure there is adequate overhead clearance for boom 3 For carrying loads on decks A Boom must be retracted center...

Страница 21: ...d on the display After the engine is started and the throttle is set release the parking brake and move the control lever smoothly until the desired speed is reached Always operate this transmission c...

Страница 22: ...d will rotate it to the operator s right Boom Pulling back will raise the boom pushing forward will lower it Telescope Pulling back on the lever will retract the boom pushing forward will extend the b...

Страница 23: ...lness Do not run the crane in enclosed areas withough adequate ventilation The following procedure is recommended for placing the crane in operation 1 Apply parking brake 2 Start engine and allow warm...

Страница 24: ...given in direct relation to the radius at which the load is being handled The capacities shown on the capacity chart are the maximum allowable at the indicated radius The greatest load that may be ha...

Страница 25: ...2 11...

Страница 26: ...2 12...

Страница 27: ...ifted on downhill side CAPACITY EXAMPLE See 7 foot 2 1 m Jib Capacity Example Page 2 17 Refer to the IC 20 1K capacity chart on the preceding page A load that is 4 feet 1 2m wide and weighs 2800 pound...

Страница 28: ...ins that pass through the sheave plates must be locked in place with cotters to hold the line on the sheaves The load line must pass through the center of the downhaul through the wedge socket and the...

Страница 29: ...n the figure The dead end of the rope in the wedge socket should be clamped as shown in the figure The clamp must not be used on the live part of the rope This will seriously weaken the rope by metal...

Страница 30: ...ed position should power or hydraulic pressure line failure occur This valve is adjustable to hold the desired load If the boom creeps in under load this valve should be adjusted If adjustment fails t...

Страница 31: ...9 mm diameter 6X36 IWRC IPS wire rope 9160 pound 4155 kg breaking strength and 2 ton hook has a single part line capacity of 2500 pounds 1100 kg on the first wrap The front auxiliary winch is designe...

Страница 32: ...you are sure this will not cause an overload you can swing the boom to a safer position If the load is the maximum for the loadline or attachment the load should be set down in a safe place using the...

Страница 33: ...rator is solely responsible for operation of the crane Setting the Rated Capacity Limiter for the configuration of the crane is necessary before starting a lift If incorrectly set the system will not...

Страница 34: ...art Windshield washer switch Off Stop Windshield defroster switch Battery not charging Heater switch Hour meter Air conditioner switch Read operator s manual Ventilation fan switch Sound level notific...

Страница 35: ...ator Transmission oil temperature Engine start Brake fluid fill location Engine idle set Hydraulic oil low level mark Check engine Hydraulic oil filter restriction indicator Stop engine Hydraulic temp...

Страница 36: ......

Страница 37: ...ure fluid leaking from a small hole can be almost invisible yet have enough force to penetrate the skin If injured by escaping fluid see a doctor at once Serious reaction or infection can occur 7 Wear...

Страница 38: ...king on the hydraulic system remove air from the lines and cylinders involved by cycling them full stroke with the engine running until the functions operate smoothly 24 When welding on the crane or o...

Страница 39: ...e pressure 9 Check for loose pins bolts and retainers 10 Check brake fluid reservoir for appropriate fluid level 11 Operate foot brake Check for operation 12 Operate park brake Check for operation and...

Страница 40: ...load line and hooks for damage 14 Check condition of sheaves and load line retainers 15 Check hydraulic oil level 16 Check anti two block system for proper operation 17 Check back up alarm for proper...

Страница 41: ...INTERVALS 1 50 hour maintenance 50 and 250 hour lubrication 2 Adjust fan belt tension 3 Check tension of fan and alternator belts 4 Clean battery 5 Inspect all bolts for tightness 6 Visually inspect...

Страница 42: ...n 250 hours in 6 months 1 Perform 250 hour maintenance and lubrication 2 Change hydraulic filter elements and inspect oil 12 MONTH INTERVAL For usage less than 500 hours per year 1 Perform 6 month mai...

Страница 43: ...___________________________ _______________________________________________________________________ _______________________________________________________________________ ____________________________...

Страница 44: ...Drain and refill after 1 000 hours of operation or after one year of ser vice whichever comes first WIRE ROPE LUBRICATION The wire rope should be cleaned and lubricated every 50 hours of normal opera...

Страница 45: ...3 9 IC 20 LUBRICATION CHART...

Страница 46: ...Points 16 Rotation Bearing MPG X 1 Zerk 17 Rotation Cylinders MPG X 4 Zerks 18 Sheave Block MPG X 2 Zerks 19 Sheave Pins MPG X 1 Zerk Std 1 On Boom Ext 20 Steering Cylinder Ends MPG X 2 Zerks 21 Stee...

Страница 47: ...clean or the space is too limited the cable can be wound directly from the storage spool onto the hoist but the spool must rotate in the same direction as the hoist 2 Check the seizings on the ends o...

Страница 48: ...nd to install the sheave block See the Operation Section for instructions on reeving and wedge socket attachment 12 Install the cable retainer pins and cotters in the tip sheave plates 13 For the cabl...

Страница 49: ...3 13 JIC SCHEMATIC...

Страница 50: ...o steering is required the entire flow goes through the priority valve and leaves through port EF to the crane valve The crane operating speed is not affected since there is no loss of volume passing...

Страница 51: ...3 15 STEERING SYSTEM...

Страница 52: ...off the ground is on ice or for any reason starts to spin it will momentarily take more oil than the wheel that has traction When this happens a spool inside the positraction valve will shift and res...

Страница 53: ...3 17 IC 20 PROPULSION SYSTEM...

Страница 54: ...figure below 4 Start the engine at the lowest speed and shut it off again after running 5 seconds Repeat this twice This procedure enables the charge pump to draw in the oil before running the pump c...

Страница 55: ...cored or damaged Remove parts and examine Replace defective parts If severe scoring is indicated remove complete pump unit disassemble and inspect for damage M Drive coupling broken Inspect coupling f...

Страница 56: ...sive contaminants If water is found the oil should be changed in the reservoir and purged out of the cylinders If excessive particles are found the source should be located and fixed and the oil shoul...

Страница 57: ...and seals in the hydraulic system CAUTION Serious damage to the pumps will result if they are run with the shutoff valve closed or with insufficient oil level in the reservoir Observe the operation of...

Страница 58: ...pump shaft 2 Low oil level in the reservoir 3 Clogged suction filter or shut off valve not fully opened 4 Valve spool linkage not allowing control valve to fully open Valve spool should move 5 16 inc...

Страница 59: ...ng valve loosen the jam nuts on the adjusting screw and tighten the screw until unpowered boom movement stops Retighten the jam nuts If adjusting the valve does not help the cylinder may have internal...

Страница 60: ...ndition by its appearance If you think the filter may need service remove it and replace or clean it before reassembling air cleaner Conditions where more dirt than usual is in the air especially soot...

Страница 61: ...mainframe and turret which are Grade 8 The torque chart on the next page can be used on all bolts WHEEL BEARING ADJUSTMENTS Wheel bearing adjustment must be maintained at all times Adjustment is made...

Страница 62: ...7 16 24 32 40 54 60 81 1 2 37 50 60 81 92 125 9 16 53 72 88 119 132 179 5 8 74 100 120 163 180 244 3 4 120 163 200 271 296 401 7 8 190 258 302 409 473 641 1 282 382 466 632 714 968 THE FOLLOWING RULES...

Страница 63: ......

Страница 64: ......

Страница 65: ......

Отзывы: