ZB110H Installation Guide
Page 6
1
3
2
New Construction Installation
6
Insert Mask and
Finish Ceiling
7
Install Grille
See Page 12 for Operations, Cleaning and Maintenance, and Troubleshooting.
Mask protects unit
during construction.
Remove before
installing Grille.
• Install ceiling material.
• Cut out around Housing.
Plug in
Sensor
CAUTION
If the blower was unplugged, power must be
disconnected (see page 2, WARNING item 2)
before inserting motor plug into control assembly.
IN ORDER TO PREVENT MOTOR/CONTROL DAMAGE: