Broan NUTONE QT series Скачать руководство пользователя страница 5

5

8. Connect electrical wiring.

Run 120 VAC house wiring to installation location. Use proper UL approved connector to 
secure house wiring to housing. Connect black to black, white to white, and green to ground 
(bare) wire. 

9. Replace wiring cover and motor plate assembly. 

Replace items removed in Steps 1 & 2. 

10. Plug in motor. 

Отзывы: