background image

ASG

-

S200, ASG

-

S400, ASG

-

S500

4

Advanced Secure Gateway

Quick Start Guide

4. Activate any add-on licenses that were purchased:

Go to 

support.broadcom.com/security

 and click 

My 

Entitlements

. When prompted, enter the admin 

Username

 and 

Password

.

Search for the appliance you want to license by enter

-

ing its 

Serial Number

Site ID

, or 

Email

.

When the appliance appears, click the 

License 

Download

 icon.

Repeat the previous steps to install any additional add-

on licenses.

5. If any add-on licenses were installed, download and in

-

stall the updated base license:

In the Management Console window, navigate to the 

Proxy > Maintenance > Licensing > Install

 tab.

Click 

Retrieve

. The appliance downloads the updated 

base license from the licensing server and installs it.

6. Activate and view the installed licenses and services:

In the Management Console window, navigate to the 

Content Analysis > System > Licensing 

tab. 

Each licensable service shows the following:

Status:

 The availability of a service component and 

its expiration date.

Active:

 The activation status of the component.

To activate a service component, click its checkbox.

Click 

Save Changes

.

6 — Perform a Graceful Shutdown

Before mounting the appliance, log in to CLI and perform a 

graceful shutdown of the appliance.

To perform a graceful shutdown:
1. Open a terminal emulation program and log in to the 

appliance.

NOTE: 

Confirm the appliance’s 

DB9 Serial

 port is con

-

nected to a serial terminal or workstation and that the ter

-

minal emulation software is configured as in 

Perform the 

Initial Configuration

.

2. When prompted with the Serial Console welcome 

screen, to access CLI, press: 

1

3. To access privileged commands, enter: 

enable

4. When prompted, enter the enable 

Password

 specified 

during the initial configuration.

5. Enter: 

shutdown

WARNING! 

Do not power off the appliance with the soft pow

-

er switch or by removing the power cables! Abruptly removing 

power can result in irreparable data loss. Always use the 

shutdown

 command from CLI to power off the appliance.

7 — Mount the Appliance

The slide-rail kit included with 

ASG

-

S400

 and 

ASG

-

S500

 ap

-

pliances (available as an option for 

ASG

-

S200

 appliances) 

allows the appliance to be mounted in a 4- or 2-post equip

-

ment rack. The slide-rail kit includes the following parts:

NOTE: 

Installation of the slide rails requires an M4 nut driver 

or adjustable wrench and a #2 Phillips head screwdriver. If 

you are working alone, a mechanical lift is also required.

NOTE: 

The following procedure documents installation for 4-

post equipment racks (as shown in 

Figure 2

). For 2-post instal

-

lation, see the 

S-Series WebGuide

, available at:

techdocs.broadcom.com/sseries

Item

 (2) Front brackets
 (2) Inner rails
 (2) Rear brackets
 (2) Center brackets

 (2) Rack ears

 (8) M6x13 screws
 (8) M6 cage nuts
(10) M4x4L screws
 (4) M3L4 screws

ASG-S200 (Optional) and ASG-S400 Rail Kit

Item

 (2) Front brackets
 (2) Inner rails
 (2) Rear brackets
 (4) Middle brackets
 (8) M6x13 screws
 (8) M6 cage nuts
(10) M4x5L screws
 (4) M4x4L screws 

ASG-S500 Rail Kit

Отзывы: