82666 Rev. D
4
75 Series Installation
2
Diverter Cartridge Installation
Diverter Bonnet Installation
Slide bonnet nut (1) over diverter sleeve (2) and
thread into rough-in body.
Hand tighten securely.
B.
For Diverter Cartridge Installation:
Apply silicone lube to the o-ring (2) to make
the diverter sleeve (3) easier to install diverter
cartridge.
Rotate the diverter cartridge (1) so the pin is at
the bottom for proper installation.
Apply silicone lube to the o-rings (4) to make
the diverter sleeve (3) easier to install diverter
cartridge.
Align diverter sleeve so that the notches are in
the same position as the notches on rough-in
body (5).
A.
3
1
5
2
1
2
5
4
Escutcheon Installation
For finished wall thickness up to 1 1/8". Slide
o-ring (4) over cartridge and bonnet. Secure
the escutcheon (1) to the rough-in body (2)
using 4 screws (3) provided. Do not over tighten
escutcheon screws.
Slide trim sleeve (5) over valve cartridge (6) and
bonnet (7).
Place escutcheon cover (8) onto escutcheon and
hand tighten trim nut (9) provided onto diverter
sleeve until secure.
Note: For thick wall installation, order
installation kit RP90545 to support finished
wall thickness up to 2 1/8".
1
A2.
2
5
6
3
7
A1.
8
9
3
Trim Installation
3
4
Содержание MultiChoice T75 Series
Страница 27: ...Notes Notas 11...
Страница 28: ...Brizo Kitchen Bath Company Product Service 55 E 111th Street Indianapolis IN 46280...