13
This cable is field supplied and shall access the Icebox through a grommet located beneath the flashings
on the return air side, refer to Diagram 13. Run the cables under the flashing; do not drill any holes in the
flashing for cable access.
Diagram 13:
Wiring into the Icebox
Diagram 14:
Flashing & Condensate installation
7.
Run a bead of silicone on the
flashing faces that will mate with
the house.
8.
Push Icebox into position up
against the building wall.
9.
Install condensate drain.
Note: 2-core
shielded
communication cable shall be installed from the Icebox unit (Terminals S1 & S2) to
the condenser unit. The shield of the cable shall be earthed at the condenser end only, refer Diagram 15.
2-Core
Shielded
Communication Cable to CDU
2-Core Cable to:
BX5
- Heater PCB (refer Diagram 19)
BX3
- Programmable thermostat (refer Diagram 20)