
Preparing Sill Base
Assembling Sill
use construction adhesives and sealants where recommended
Drill Ø3[0.12] to match fixing holes
2
Insert 94P into 97HS57
Drill hole Ø9.5[0.37]x90° at either end of sill for jamb fixings.
Fixing holes for wood T placed at 400[15.75] intervals (
2
Ø9.5[0.37]x90°)
Screw Flutes
Apply adhesive to 97HS57’s grooves
and attach wood T
2
Shape Jamb to match profile of 97HS57
Screw fix wood T to
97HS57
2
8G x 19[0.75] Screws
Drill Ø3[0.12] to match jamb fixing holes
Attach 97EC - screws supplied
Attach jamb
to sill - apply
sealant to
screw heads
Frame can then
be fixed to
opening on-site
Wood T pinned in place last
1
Drill drainage hole through 94P and 97HS57 Ø8[0.32] and 2 holes through flush bolt recesses Ø5[0.20] each end
Ø9.5
[0.37]
90°
400
[15.75]
400
[15.75]
JT-6[0.24]
2
JT-6[0.24]
2
T fixings
2
Jamb fixings
NON-PIVOT
END
PIVOT
END
JT-3[0.12]
JT+80[3.15]
Ø8[0.32]
Ø5
[0.20]
Ø5
[0.20]
Drainage
holes not to
pierce sill’s
underside
JW
75°
XT +87[3.43]
2
Ø3[0.12]
T
2
T
2
44.5[1.75]
T
1A
T
2
57.2[2.25]
T
1B
T
2
97SR
JT-3[0.12]