Brightwell Brightlogic 2 Скачать руководство пользователя страница 5

5

Revision 1.0

05/2022

B1051EN

 

INSTALLATION - WIRING 1

In most cases, the interface board or solenoids in the host machine will have a common (i.e their 

negative terminals are all linked by a common wire).

The switches S1 & S2 can be left switched to common (up position), and the single(common) wire 

taken to the B rail.

Note:

If a signal is applied to Input 2 before Input 1 then the unit will assume that a Pre-wash is not 

occurring and will ignore subsequent signals to input 1 until the unit has reset.

A

RAIL

COMMON

COMMON

ISOLATED

COMMON

B

RAIL

LK10-LK19

 Switch to common signals

on the B-rail

RP1, RP2, RP3 & RP4

Remove to allow signals below

90 volts AC or DC (min 12V)

 

Lorem ipsum

B Rail

(Negative)

With the switches in an 

upright position, a

 

common (neutral/nega-

tive) input signal can be 

taken to the B Rail.

A Rail

(Positive)

The positive (live) signal 

from each input must be 

taken to the relevant

connection on the A Rail.

Seperate connections

 

are provided on input 2 

for Hot & Cold wash 

signals.

Example

Recommmended Wiring

Max Size = 1.5mm

²

Max Size = 0.5mm

²

Current = 0.5A

Safety Warning

If low voltage signals are used, signal wires to the A 

and B rails should be routed in separate cable from the

 

main power to the unit.

Suitable grade wire must be used.

INPUT 1 - Pre-Wash

INPUT 2 - Main Wash

INPUT 3 - Rinse
COMMON

Power Supply

100-240v(AC) 50/60Hz

Sourced from a point which

 

is isolated when the host 

machine is off

 

Signal Inputs 90v-240v AC or DC

AFS

AFS

E - 4

S1 & S2

ISOLATED

ISOLATED

L

L

N

N

Содержание Brightlogic 2

Страница 1: ...Brightlogic 2 Quickstart Guide Installation and Setup Brightwell co uk Revision 1 0 05 2022 B1051EN...

Страница 2: ...TALLATION MOUNTING 4 INSTALLATION WIRING 1 5 INSTALLATION WIRING 2 6 PROGRAMMING CONTROLS 7 PROGRAMMING KEY TO INSTRUCTIONS 7 PROGRAMMING LANGUAGE SELECTION 8 FLOW DIAGRAM INSTRUCTIONS 9 FLOW DIAGRAM...

Страница 3: ...lace heavy objects on top of the unit Do not attempt to place items such as screwdrivers into the moving parts of the pumphead Do not power the unit outside of the values stated on the rating label Do...

Страница 4: ...ws provided Ensure that the unit is level and positioned no more than 2 metres above the base of the product which is to be dispensed Important notes Maximum recommended suction and delivery tubes 2 m...

Страница 5: ...90 volts AC or DC min 12V Lorem ipsum B Rail Negative With the switches in an upright position a common neutral nega tive input signal can be taken to the B Rail A Rail Positive The positive live sig...

Страница 6: ...RAIL B Rail Negative With the switches in an upright position a common neutral nega tive input signal can be taken to the B Rail Separate connections are provided on input 2 for Hot Cold wash signals...

Страница 7: ...ed together PROGRAMMING KEY TO INSTRUCTIONS If buttons are shown in GREY they are used individually to achieve the desired result ie Either or SIGNAL ACCEPTANCE TIME 00 SECONDS MAN 1 MAN 2 MAN 3 OFF P...

Страница 8: ...nter the correct four digit access code using the UP and DOWN keys to select a number and the FWD ACCEPT key to move see page 15 Use the UP and DOWN keys to scroll through the language options Press t...

Страница 9: ...PUMP 1 SPEED 100 SET PUMP 1 FLOWRATE 00000ML 01 01 2015 SET PUMP 1 SPEED 60S 100 SAVE SETTINGS NEXT PAGE NEXT PAGE MAN1 1 MAN 2 MAN 3 OFF 1 2 3 4 5 6 7 8 9 0 01 STANDARD MODE 00 10 01 01 2015 DATE TIM...

Страница 10: ...UT 01 PUMP 01 SET DELAY TIME 00 MIN 00 SECS PROGRAM 01 LOAD COUNT PUMP 03 PROGRAM 01 PUMP 1 LEVEL 2 DISABLE PROGRAM 01 PUMP 2 LEVEL 1 SET RUN TIME 00 MIN 00 SEC MASTER LOAD COUNT PUMP 04 PROGRAM 02 ST...

Страница 11: ...a to Previous program resets to the previous program The unit can be manually reset by pressing the up and down keys together for 1 second Without a Formula Select module If there is no formula select...

Отзывы: