113
7
7
Figure 28
4. Place new C-ring over chamfered end of
shaft.
5. Align one of the slots (
G
, Figure 28) of C-
Ring Installer #19435 with open end of C-
ring (
H
).
6. Press on tool until C-ring snaps into
groove in shaft.
7. Manually actuate pinion gear on helix to
ensure proper movement.
Figure 29
Disassemble Starter Drive - Roll Pin Retainer
1. Place starter drive retainer on support
block (Figure 29) and drive out roll pin (
A
,
Figure 30) with a 5/32” (.4mm) pin punch.
Discard roll pin.
Figure 30
Figure 31
2. Remove retainer (
B
), washer (
C
), pinion
gear (
D
), and starter clutch (
E
) from starter
shaft.
Содержание 120000
Страница 5: ...THISPROPER SERVICE AND REPAIR IS IMPORTANT TO THE SAFE ECONOMICAL AND RELIABLE ...
Страница 15: ...12 1 1 Figure 7 Figure 8 Figure 9 Figure 10 Figure 11 Figure 12 ...
Страница 27: ...24 2 2 OIL GARD SYSTEMS 49 ENGINE WILL NOT START 49 ENGINE STARTS AND RUNS WITH LOW OIL 50 ...
Страница 105: ...102 6 6 ...
Страница 136: ...133 9 9 Figure 22 Figure 23 Figure 24 ...
Страница 137: ...134 9 9 ...
Страница 149: ...146 10 10 ...
Страница 179: ...176 12 ...