2381.01-2003
— 17 —
PREPARATION FOR EXPLOITATION.
In order to set the boat in the operation condition perform as follows:
Unfold the inflatable balloon.
Apply the foot pump to fill the afterbody of the compartments with air to the pressure being slightly below its rated value (the balloon will be
completely straightened). Then fill the forebody compartment with air up to the rated pressure.
The rated pressure value is 0.15 bar (2.2 pci).
On completion of filling close the valves with bonnets B (rotate them clockwise), (look before).
Assemble the oars by entering the removable parts with blades into the locks until the click. Make use of the holes provided in the oar handles
to set the oars into the rowlocks with the blades being faced to the aft. Secure the oars in the holders.
When mounting the outboard engine make sure that it is reliably fixed to the transom. In addition, take every precaution to avoid any contacts
of the fuel with the boat surfaces.
It is dangerous to pretend to
be an expert. This may cause
damages. Refer to expert and
authorized specialists for all
types of maintenance and repair.
Check before navigation that that
the drain valve for bilge water is
closed by plug. Open to pour out
the bilge water
(! ashore ONLY !)
DRAIN SYSTEM.
1 - Drain valve for cockpit watar
(see Fig.10)
2 - Drain valve for bilge watar
Check before navigation
of boat into the water that
the drain valve is closed.
Open to pour out
t h e b i l g e w a t e r
(! ashore ONLY !)
1
2
Open to pour out the water from
the deck
Fig.10