Bale King 6100 – Operator and Parts Manual
21 / 65
Loading the processor
To load bales on the processor:
1.
Position the processor so the back of the deck is aligned with the center of
the bale(s) you wish to load.
2.
Raise the deck until the skid shoe gently touches the ground.
3.
Back slowly under the row of bales and rotate the conveyor chain to draw
the bales up the deck, matching tractor speed to the chain speed. Let the
chain run until the first bale reaches end of the deck.
4.
Stop rotating the chain and load the first bale into the tub with the fork.
5.
Rotate the conveyor chain to draw bales up onto the deck while backing
slowly under the row of bales.
6.
Lower the fork to its home position before you load the deck with the final
bale.
7.
Lower the deck when the final bale is loaded. Allow tractor to roll forward
as you lower the deck.
TIP: Once first bale is on the deck, lower deck slightly to minimize twine
build-up on the rear pulley.
Содержание Bale King 6100
Страница 1: ...By Bale King 6100 Bale processor OPERATOR PARTS MANUAL WWW BRIDGEVIEWMANUFACTURING COM NORTH AMERICA ...
Страница 40: ...Bale King 6100 Operator and Parts Manual 40 65 Gearbox Assembly ...
Страница 50: ...Bale King 6100 Operator and Parts Manual 50 65 Main deck ...
Страница 56: ...Bale King 6100 Operator and Parts Manual 56 65 Decal ...
Страница 58: ...Bale King 6100 Operator and Parts Manual 58 65 Hydraulics Wiring Diagram ...
Страница 59: ...Bale King 6100 Operator and Parts Manual 59 65 Chain Motor ...
Страница 60: ...Bale King 6100 Operator and Parts Manual 60 65 Tilt Fork Deflector ...
Страница 61: ...Bale King 6100 Operator and Parts Manual 61 65 Light Diagram ...
Страница 62: ...Bale King 6100 Operator and Parts Manual 62 65 Diverter Diagram Machine side ...
Страница 63: ...Bale King 6100 Operator and Parts Manual 63 65 Tractor Side Control Box 23988 ...